Laserfiche WebLink
Chandler Martin <br /> COMMUNITY DEVELOPMENT <br /> PA-05-804 (UP) <br /> 2. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $193.16 daily trip-end <br /> generated in the Lodi area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolutions R-00-433) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. Final Site Plan is <br /> required upon submittal of verification. <br /> Note: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:SH:ar <br /> P:\COMMENTS\Comments-TEMPLATES\COMMENT UP.wpd <br />