Laserfiche WebLink
S JCOG, Inc. <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0435 <br /> San Joaquin County Multi-Species Habitat Conservation & Open Space Plan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION (RTLJ)A <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. <br /> To: Rick Griffen,Community Development Department <br /> From: Laurel Boyd, SJCOG, Inc. <br /> Date: July 2,2015 <br /> Local Jurisdiction Project Title: PA-1500102(SA) <br /> Assessor Parcel Number(s): 091-050-15 <br /> Local Jurisdiction Project Number: PA-1500102(SA) <br /> Total Acres to be converted from Open Space Use: Unknown <br /> Habitat Types to-be Disturbed: Agricultural Habitat Land <br /> Species Impact Findings: Findings to be determinedby SJMSCP biologist. <br /> Dear Mr.Griffin: <br /> SJCOG, Inc. has reviewed the application referral for PA-1500102 (SA). This project consists of a Site Approval <br /> application to construct a 1,200 square foot covered storage area for an existing farm equipment repair shop. The project <br /> site is located on the north side of E. State Route 26, 600 feet east of N. Jack Tone Road, Linden (APNIAddress: 091- <br /> 050-15; 13655 E. State-Route 26 Highway, Linden). <br /> San Joaquin County is a signatory to San Joaquin County Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP-satisfies requirements of both the state and federal endangered species acts, <br /> and ensures that the impacts are mitigated below a level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. <br /> This project is not subject to participate at this time due to structure and ground disturbance already <br /> existing. Any future structures that require ground disturbance on this or subsequent divided parcels Will be <br /> subject to participate in the SJMSCP and should be resubmitted to this agency. <br /> It should be noted that if this project has any potential impacts to waters of the United States[pursuant to Section 404 Clean Water Act],it would require <br /> the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 days. It maybe prudent to obtain a <br /> preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed on the project site,the Corps and the Regional Water <br /> Quality Control Board(RWQCB)would have regulatory authority over those mapped areas[pursuant to Section 404 and 401 of the Clean WaterAct <br /> respectively]and permits would be required from each of these resource agencies prior to grading the project site. <br /> If you have any questions, please call (209)235-0600. <br />