My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004667 (3)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
18754
>
2600 - Land Use Program
>
PA-0400588
>
SU0004667 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:50:26 AM
Creation date
9/9/2019 10:28:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004667
PE
2632
FACILITY_NAME
PA-0400588
STREET_NUMBER
18754
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
APN
10517048, 47 &
ENTERED_DATE
10/21/2004 12:00:00 AM
SITE_LOCATION
18754 E HWY 26
RECEIVED_DATE
10/18/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\18754\PA-0400588\SU0004667\PUB REC REL APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i* <br /> Chandler Martin -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-04-588 (SA) <br /> REQUIREMENTS: <br /> 1. A traffic impact study shall be required to determine the impacts and mitigations of the proposed project. <br /> The developer.shall deposit funds with the County for all costs, as estimated by the Department of Public <br /> Works Infrastructure Planning Division,prior to Department of Public Works preparing or contracting for <br /> the required study. Any mitigation required by the traffic study shall be provided by the applicant. <br /> (Development Title Section 9-1150.4) <br /> Upon approval of the requirement above,the following Conditions of Approval shall apply: <br /> RECOMMENDATIONS: <br /> I. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $179.44 per daily trip-end generated in the <br /> Lockeford area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.) (Resolutions 00-433) <br /> 2. The Water Supply Facilities Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$569.00 per 1,000 gross square <br /> foot of building designated as Service Commercial. The fee shall be automatically increased on January 1 <br /> of each year through the year 2005 at the rate of 7.66 percent. A credit may be allowed if it can be verified <br /> that the existing development on this site was in operation on or after April 30, 1991.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> Plan is required upon <br /> Projects. Final Site q p <br /> requirements of the Waste Plan Format for Development � <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> PACOMMENMSAWR 2004TA-0400588 Pre-applicetion.wpd <br />
The URL can be used to link to this page
Your browser does not support the video tag.