Laserfiche WebLink
' pAV.!N. O <br /> 1 ���q <br /> THOMAS M. GAU _ P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> g' :" DIRECTOR 1 'tih STOCKTON,CALIFORNIA 95201 <br /> �,., /''� (209)468-3000 FAX(209)46&2999 <br /> �l/FOPNp V . <br /> � �.., � wwwsjgov.org/pubworks <br /> FRITZ DEPU-Y UCHMAN _' ! RECEIVED DEPUTY DIRECTOR V �/ <br /> MICHAEL SELLING jv' g <br /> DEPUTY DIRECTOR 5 SEP — 2012 <br /> ROGER JANES GII�� J L I <br /> BUSINESS ADMINISTRATOR San Joaquin County <br /> Community Development <br /> August 29,2012 <br /> MEMORANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Mo Hatef <br /> FROM: Alex Chetley,Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-1200136;A Use Permit application for a large agricultural store.The project consist of converting <br /> a 2,339 square foot portion of an existing wine storage building into a large agricultural store; located <br /> on the southwest corner of Taddei Road and Bender Road,north of Lodi. (Supervisorial District 4) <br /> PROPERTY OWNER: Viaggio, Inc. APPLICANT: Same <br /> ADDRESS: 108 E. Taddei Road,Acampo APN: 013-130-25 &26 <br /> INFORMATION: <br /> The western portion of the site is currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. The 100-year Flood Elevation will be approximately 35 feet NGVD. <br /> Bender Road has an existing right-of-way width of 40-feet and a planned right-of-way width of 50-feet. <br /> Taddei Road has an existing right-of-way width of 40-feet and a planned right-of-way width of 50-feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Impact Mitigation Fee shall be required for any incremental traffic resulting from this <br /> application. The fee is due and payable at the time of building permit application. The fee shall be <br /> automatically adjusted July I of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record. (Resolution R-00433) <br /> 2. The Regional Transportation Impact Fee shall be required for any incremental traffic resulting from this <br /> application. The fee is due and payable at the time of building permit application.The fee will be based on <br /> the current schedule at the time of payment. (Resolution R-06-38) <br />