My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009320
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TADDEI
>
108
>
2600 - Land Use Program
>
PA-1200136
>
SU0009320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:57 AM
Creation date
9/9/2019 10:32:45 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009320
PE
2625
FACILITY_NAME
PA-1200136
STREET_NUMBER
108
Direction
E
STREET_NAME
TADDEI
STREET_TYPE
RD
City
ACAMPO
Zip
95220-
APN
01313025 26
ENTERED_DATE
8/21/2012 12:00:00 AM
SITE_LOCATION
108 E TADDEI RD
RECEIVED_DATE
8/20/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TADDEI\108\PA-1200136\SU0009320\APPL.PDF \MIGRATIONS\T\TADDEI\108\PA-1200136\SU0009320\CDD OK.PDF \MIGRATIONS\T\TADDEI\108\PA-1200136\SU0009320\EH COND.PDF \MIGRATIONS\T\TADDEI\108\PA-1200136\SU0009320\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PA-1200136 (UP) Project - 2 - 29 August 2012 <br /> San Joaquin County <br /> Phase I and II Municipal Separate Storm Sewer System (MS4) Permits' <br /> The Phase I and II MS4 permits require the Permittees reduce pollutants and runoff flows from <br /> new development and redevelopment using Best Management Practices (BMPs) to the <br /> maximum extent practicable (MEP). MS4 Permittees have their own development standards, <br /> also known as Low Impact Development (LID)/post-construction standards that include a <br /> hydromodification component. The MS4 permits also require specific design concepts for <br /> LID/post-construction BMPs in the early stages of a project during the entitlement and CEQA <br /> process and the development plan review process. <br /> For more information on which Phase I MS4 Permit this project applies to, visit the Central <br /> Valley Water Board website at: <br /> hftp://www.waterboards.ca.gov/centralvalley/water issues/storm water/municipal_permits/. <br /> Industrial Storm Water General Permit <br /> Storm water discharges associated with industrial sites must comply with the regulations <br /> contained in the Industrial Storm Water General Permit Order No. 97-03-DWQ. <br /> For more information on the Industrial Storm Water General Permit, visit the Central Valley <br /> Water Board website at: <br /> hftp://www.waterboards.ca.g ov/centralva I ley/water_iss u es/storm_water/ind ustri al_general_pe rm <br /> its/i ndex.shtm I. <br /> Clean Water Act Section 404 Permit <br /> If the project will involve the discharge of dredged or fill material in navigable waters or <br /> wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the <br /> United States Army Corps of Engineers (USACOE). If a Section 404 permit is required by the <br /> USACOE, the Central Valley Water Board will review the permit application to ensure that <br /> discharge will not violate water quality standards. If the project requires surface water drainage <br /> realignment, the applicant is advised to contact the Department of Fish and Game for <br /> information on Streambed Alteration Permit requirements. <br /> If you have any questions regarding the Clean Water Act Section 404 permits, please contact <br /> the Regulatory Division of the Sacramento District of USACOE at (916) 557-5250. <br /> Clean Water Act Section 401 Permit—Water Quality Certification <br /> If an USACOE permit, or any other federal permit, is required for this project due to the <br /> disturbance of waters of the United States (such as streams and wetlands), then a Water <br /> Quality Certification must be obtained from the Central Valley Water Board prior to initiation of <br /> project activities. There are no waivers for 401 Water Quality Certifications. <br /> ' Municipal Permits=The Phase I Municipal Separate Storm Water System (MS4) Permit covers medium sized <br /> Municipalities (serving between 100,000 and 250,000 people)and large sized municipalities(serving over <br /> 250,000 people). The Phase II MS4 provides coverage for small municipalities, including non-traditional Small <br /> MS4s, which include military bases, public campuses, prisons and hospitals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.