| 
								        		,�ppJlry
<br />    								SAN JOAQUIN COUNTY
<br />  			J
<br />       						ENVIRONMENTAL HEALTH DEPARTMENT
<br />     						304 E Weber Avenue 3rd Floor Stockton•CA 95202-2708
<br />      					(209)468-3420•Far:(209)464-0138 • Web:www.co.san-joaquin_ca.US/ehd
<br />    		SURFACE AND SUBSURFACE CONTAMINATION REPORT REQUIREMENT CHECKLIST
<br />		SITE LOCATION:     �7vv L    /.3-l-A   S,  						PA#:     	0;Z
<br />    														REPORT DATE:
<br />		S = Sufficient     San Joaquin County Development Title Chapter 9-905,Section 9-905-12
<br /> 		1 - IasutTicient
<br />  		S       I     1.0 INTRODUCTION & PROPOSED DEVELOPMENT SECTION
<br /> 		F1    ❑    1.1  Description of site(report must address all parcels),including current and/or proposed zoning information.
<br /> 		F1    ❑    1.2  Description of proposed development.
<br /> 		41    ❑    1.3  Parcel location map. A*,,.,u, ,  A
<br /> 		El    ❑    1.4  Site map showing location of all items on parcel. (Examples:structures,drives,wells,septic systems, large trees,
<br />					pastures,pools,natural drainage courses, ponds,waterways,etc.) :aF.ti,      y ,'
<br />   				2.0 PAST, PRESENT AND PROPOSED FUTURE USES OF THE SITE SECTION
<br /> 		El    ❑    2.1  Discussion of past,present and proposed future uses at the site to assess potential problems. (Example sources
<br /> 					of information:current and/or previous property owners,historical maps,insurance maps, previous land use
<br /> 					applications,etc.) p�,Z_ _/f/
<br />   									A17u4,,a, Y A A' C
<br />   				3.0 IDENTIFICATION OF ALL PAST AND CURRENT SOURCES OF CONTAMINATION
<br />   			❑    3A  Discussions of the methods used to research and investigate the potential or known above and belowground
<br /> 					sources of contamination at the project site. (Examples: Database search,EHD records search,agricultural
<br /> 					chemical application search,site reconnaissance and survey,etc.)
<br />  		R    ❑    3.2  Description of all past on-site potential and/or known above and bek)w ground sources of contamination identified
<br /> 					at the project site. (Examples: Agricultural chemical handling/storage/use,aboveground/underground tanks,
<br /> 					septic systems,injection wells,unsealed wells,pondsAagoons,vehiclelmachine repair/painting, buried or
<br /> 					stockpiled solid waste,etc.) P  -�   4,9 "  ;
<br />  		El    ❑    3.3  Description of all current on-site potential and/or known above and below ground sources of contamination
<br /> 					identified at the project site(see examples above). 12'  -;�,) v,e if/-I,*-— ,sa-i s rc-      *�
<br />   			El3.4  Description of all past off-site potential and/or known above and below ground sources of contamination identified
<br /> 					in the area of the project site that has or may impact the project site. (Examples: Close proximity to a former
<br /> 					landfill/former gasoline station,in area of known DBCP/Nitrate groundwater impact,etc.)  	nP,,rev      S
<br />  		n    ❑    3.5  Description of all current off-site potential andlor known above and below ground sources of contamination
<br />  					identified in the area of the project site./'S �� 			vis f   	Who c."" 	tj       �
<br />    				4.0 EVALUATION OF PAST AND CURRENT SOURCES OF CONTAMINATIO IDENTIFIED
<br />  					AT OR NEAR THE SITE AND RECOMMENDATIONS FOR FURTHER ACTION
<br />   		El     ❑   4.1  Evaluation of each potential and/or known source of contamination identified(n the above section)for any real
<br />  					and/or potential threat to human health and the environment_ This evaluation should take into consideration the
<br />  					proposed future uses of the project parcel.
<br />    				5.0 CONCLUSIONS AND RECOMMENDATIONS SECTION
<br />   		El
<br />     				5.1  Discussion of the above evaluation to either rule out each source as a real or potential threat or to recommend
<br />  					further action to mitigate or abate any real or potential threats identified. Recommendations may include
<br />  					additional site assessment(i.e.collection of soiltwater samples)and/or mitigative measures(Le.,dean up of
<br />  					surface wastes). All recommendations for future work must include a time frame for implementation. p    Y
<br />    			❑     	F—   V f r,,-i S{,  fU,/   t�r.':ti��'r.+.v,rfv"ina r it/J 1-   ,."A
<br />     				5.2  The report was inclusive(.e.all information referenced was induded in this report-report should not reference
<br />   					other reports).
<br />   		FRI     ❑    5.3  The report was signed,dated and stamped by a qualified environmental professional.
<br />    		r       ❑    5.4  The report was prepared within six months of the date of the submittal of the land use application.
<br />     			❑    5.5  The attachments/appendices contain sufficient documentation to support claims made in report.
<br />    				Reviewed B    									Reviewed Date: � 11.161  -
<br />   						Y:    			�
<br />      		EHD 2602-001     					Page I o f 2      					Surface&Sub Checklist
<br />      		7/14,1003
<br />
								 |