Laserfiche WebLink
11/17/2005 16:50 12090'-35 35 WONG ENGINEERS PAGE 03 <br /> 1000 y <br /> U b b I t: U <br /> r•' y � <br /> DRESS POST ADDRESS <br /> 1ESSFor Inspection Cali - ii 468-31 f5 AT ACCESS <br /> ADDRESS: BUILDING PERMIT NUMBER:QCua?.�0�3 <br /> .,::,'.r„TQ8$I'TE INSPECTION RECORD-APPLICANT SHALL ON JOB SITE <br /> NO OPERATION DATE LINSIF. NO OPERATION DATE INSP. <br /> •13UILDING APPROVALS MECHANICAL.APPROVALS <br /> 1 Selbaoka(Orientation) Duct System• Underfloor <br /> 27 <br /> Footings and Forms,Soils Overhead <br /> 2 Report,Engineer Indpection <br /> Verbal Report 28 Gas Vents <br /> 3 Slabs 29 Heating/Cooling Appliances <br /> 4 Underfloor Structure 30 Commercial Hood <br /> 5 Insulation-Underfloor 31 FINAL <br /> 6 Roof Sheathing ELECTRICAL APPROVALS <br /> 7 Rough Building <br /> 32 Underelab Electric <br /> 8 Fireplace <br /> 33 Power Pole <br /> 9 Insulation-Walls <br /> 34 Underground <br /> 10 Sheetrock Nail <br /> t 1 Stucco Lath 35 Rough Wiring <br /> 12 Pre-Siding 36 Service <br /> 13 Shearwalls 37 FINAL <br /> Block SWIMMING POOLISPA APPROVALS <br /> 14 <br /> 38 Pre-Gunite Steel and Bonding <br /> Tilt 39 f Water Piping <br /> 15 Panels <br /> 40 Underground Eletrical <br /> Columns 41 Gas Piping <br /> 16 <br /> 42 Pre-Deck <br /> i <br /> 17 FINAL 43 Pre-Plaster <br /> PLUMBING APPROVALS 4.4 FINAL <br /> 18 Underground MOBILE HOME APPROVALS <br /> 19 Rough <br /> 45 Mobile Home Setup <br /> 20 Topout <br /> 45 FINAL <br /> 21 Gas Test <br /> ADDITIONAL INFORMATION <br /> 22 Gas Service <br /> 2 °Water Service r 9 0 <br /> 24 Sewer Connection <br /> 25 Waterheater <br /> i <br /> 26 FINAL <br /> NOTES <br />