Laserfiche WebLink
Table 5 <br /> Love's Travel Stops and Country Stores <br /> DEIR Alternatives Analysis <br /> Estimated Annual Property Tax Revenues(2012$) <br /> Assumptions) Annual Fiscal <br /> Item Source Formula Impact at Buildout <br /> Assessed Value of Project <br /> Land[1] a $1,318,507 <br /> Improvements[2] b $7,142,000 <br /> Total Assessed Value of Project c=a*b $8,460,507 <br /> Property Tax Revenue(1%of Assessed Value) 1.00% d=c'1,00% $84,605 <br /> Estimated Property Tax Allocation[3] <br /> County General Fund 13.89% e=d•faae% $11,751 <br /> Other Taxing EntitieslERAF 86.11% f=d'9s.11% $72,854 <br /> Property Tax In-Lieu of Motor Vehicle In-Lieu Fee Revenue(VLF) <br /> Total Countywide Assessed Value[4] g $51,812,572,501 <br /> Buildout Assessed Value[11 6=f+g $8,460,507 <br /> Total Assessed Value 1=9+h $51,821,033,008 <br /> Percent Change in AV ]=h/g 0.02% <br /> Property Tax In-Lieu of VLF [5] $60,985,000 /=1-$60,985,000 $9,958 <br /> prep_rax <br /> Source:Love's Travel Stops and Country Stores;ParcelQuest;San Joaquin County Auditor-Controller;EPS. <br /> [1] Based on the current assessed value for the following Project Assessor Parcel Numbers:025-190-32,-33,and-34. <br /> [2] Based on the estimated Project construction cost estimate,provided by Love's Travel Stops and Country Stores. <br /> [3] County General Fund and other taxing entities/Educational Revenue Augmentation Fund(ERAF)allocations of the 1% <br /> property tax rate obtained from the San Joaquin County Auditor-Controller. The allocations reflect an average of the <br /> allocations associated with each Tax Rate Area(TRA)comprising the Project;99-218;99-221 and 99-034. <br /> An approximately equal portion of each TRA covers the Project site. <br /> [4] Reflects Assessed Valuation In the County(both incorporated and unincorporated areas)for FY 2012-13. <br /> Includes Countywide secured,unsecured,homeowner exemption,and public utility roll. <br /> [5] Property tax in4ieu of VLF amount derived from the San Joaquin County FY 2012-13 Adopted Budget <br /> Pn,pevdby EPS 1/2a2013 <br /> EXHIBIT 1 <br />