Laserfiche WebLink
g. REMOVAL OF FACILITIES: Freestanding structures, antennas, and supporting equipment <br /> associated with wireless telecommunication shall be removed by the provider of such facilities and <br /> the site restored to its pre-construction state if said facilities have not been operational or used for a <br /> period of six (6) consecutive months. Removal and site restoration shall be completed within ninety <br /> (90) days of the end of said six (6) month period. (Development Title Section 9-1065.8) <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Michael Callahan, 468-3000) <br /> a. An encroachment permit shall be required for work within the road right-of-way. (Development Title <br /> Sections 9-1145.4 and 9-1145.5) <br /> b. The driveway approach shall be improved in accordance with the requirements of San Joaquin <br /> County Standard R-17 prior to issuance of the occupancy permit. (Development Title Section 9- <br /> 1145.5) <br /> c A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> 3. ENVIRONMENTAL HEALTH DEPARTMENT (Staff Contact: Mike Escotto, 468-3443) <br /> a. Any geotechnical drilling shall be conducted under permit and inspection by the Environmental <br /> Health Department. (Development Title Sections 9-1115.3 and 9-1115.6) <br /> Conditions of Approval - 2 - PA-0500607 <br />