Laserfiche WebLink
c ' THOMAS R. FLINN P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> DIRECTOR STOCKTON,CALIFORNIA 95201 <br /> (209)468-3000 FAX(209)468-2999 <br /> Xc'iiFoa�r - N% www.sigov.org/pubworks <br /> THOMAS M. GAU ,m. <br /> CHIEF DEPUTY DIRECTOR .. <br /> MANUEL SOLORIO waddn for YOU <br /> DEPUTY DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> REE C F I V <br /> October 16,2006 NOV , 2006 <br /> MEMORANDUM <br /> Community Development Cent. <br /> TO: Chandler Martin,Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Karla Kuhl <br /> FROM: Michael R. Callahan, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: PA-05-464 A SITE APPROVAL APPLICATION FOR THE INSTALLATION OF AN 84-FOOT <br /> WOOD POWER POLE WITH AN ANTENNA FOR A WIRELESS INTERNET SYSTEM, <br /> LOCATED ON THE SOUTH SIDE OF TOKAY COLONY ROAD,2,500 FEET WEST OF JACK <br /> TONE ROAD. (SUPERVISORIAL DISTRICT 4) <br /> PROPERTY OWNER: Joseph and Terri Almond APPLICANT: Chan Jasty <br /> ADDRESS: 12786 E.Tokay Colony Road APN: 063-280-26 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated Flood Hazard Area. <br /> Tokay Colony Road has an existing right-of-way width of 45 feet and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. The wood power pole shall not be placed in the County right-of-way. <br /> 2. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$194.33 per additional daily trip-end generated in <br /> the Lockeford area. The fee shall be automatically adjusted July 1 of each year by the Engineering <br /> Construction Cost Index as published by the Engineering News Record.) (Resolutions 00-433) <br /> Note: Any construction activity that results in the disturbance of at least one(1)acre of soil shall require a State <br /> NPDES construction permit. <br /> MRC:SH:av <br /> P'\COMMENTS\SA\YR 2005\PA-0500464(rmsion)—pd <br />