Laserfiche WebLink
OUIN <br /> c COUNTY OF SAN JOAQUIN THOMAS R. FLINN <br /> }� DEPARTMENT OF PUBLIC WORKS DEPUTY DIRECTOR <br /> • �q. ;P P.O. BOX 1810 - 1810 E. HAZELTON AVENUE <br /> 6'V STOCKTON, CALIFORNIA 95201 THOMAS M. GAU <br /> MANUEL LOPEZ (209) 468-3000 DEPUTY DIRECTOR <br /> DIRECTOR FAX (209) 468-2999 <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> July 12, 2000 <br /> MEMORANDUM <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department <br /> CONTACT PERSON: Tina Wehrmeister <br /> FROM: Gabriel Karam, Senior Civil Engineer Gk <br /> Public Services Division <br /> SUBJECT: SA-00-27 (REVISION) A SITE APPROVAL APPLICATION TO ESTABLISH A <br /> TRUCK PARKING FACILITY TO INCLUDE PARKING FOR A MAXIMUM OF <br /> SEVEN TRUCKS AND CONSTRUCTION OF A 900 SQUARE FOOT <br /> SHOP FOR MINOR TRUCK REPAIRS, LOCATED ON THE EAST SIDE OF <br /> TRACY BOULEVARD, 400 FEET SOUTH OF LINNE ROAD. (DISTRICT 5). <br /> APPLICANT: Surinderpal Atwal APN: 253-120-33 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Tracy Boulevard has an existing right-of-way width of 50 feet and a planned right-of-way width <br /> r 8A <br /> as per the City of Tracy. feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be obtained from the City of Tracy. Any dedications, <br /> improvements or permits for Tracy Boulevard shall be as required by the City of Tracy. <br /> %;,d for work w"Uhin read right of-way. <br /> 2 nts of <br /> (Development Title Section 9 1145w5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $184.17 per <br /> additional daily trip-end generated in the Tracy area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:tee <br /> PS-OG011-M 1-RE V <br /> E: Thomas M. Gau, Deputy Director/Development <br />