Laserfiche WebLink
oPgUlfy <br /> COUNTY OF SAN JOACFUIN THOMAS R. FLINN <br /> 2 :Z <br /> H7 ,� DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.O. BOX 1810- 1810 E. HAZELTON AVENUE <br /> c4�iFo'R`'�P STOCKTON, CALIFORNIA 95201 THOMAS M. GAU <br /> (209) 468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX (209) 468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> July 5, 2000 <br /> MEMORANDUM JUL 72000 <br /> TO: Kerry Sullivan, Deputy Director COMMun/ty DeveloPMent D <br /> Community Development Department De t. <br /> CONTACT PERSON: Tina Wehrmeister <br /> FROM: Gabriel Karam, Senior Civil Engineer GVc' <br /> Public Services Division <br /> SUBJECT: SA-00-27 A SITE APPROVAL APPLICATION TO ESTABLISH A TRUCK <br /> PARKING FACILITY TO INCLUDE PARKING FOR A MAXIMUM OF <br /> SEVEN TRUCKS AND CONSTRUCTION OF A 900 SQUARE FOOT <br /> SHOP FOR MINOR TRUCK REPAIRS, LOCATED ON THE EAST SIDE OF <br /> TRACY BOULEVARD, 400 FEET SOUTH OF LINNE ROAD. (DISTRICT 5). <br /> APPLICANT: Surinderpal Atwal APN: 253-120-33 <br /> INFORMATION: <br /> The site is not currently located within a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. <br /> Tracy Boulevard has an existing right-of-way width of 50 feet and a planned right-of-way width <br /> of 84 feet. <br /> RECOMMENDATIONS: <br /> 1. Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The driveway approaches shall be improved in accordance with the requirements of <br /> San Joaquin County Standards R-17 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee will be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $184.17 per <br /> additional daily trip-end generated in the Tracy area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record.) <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-179, R-95-650 and R-96-592) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> GK:BN:mr <br /> P S-OG01 1-MI <br /> E: Thomas M. Gau, Deputy Director/Development <br />