Laserfiche WebLink
S J C 0 G, Inc. <br /> 555 Fast Weber Avenue •Stockton,CA 95202• (209)235-0600•FAX(209)235-0600 <br /> San Joaquin County Multi-Species Habitat Conservation & <br /> Open Space Plan (SJMSCP) <br /> D Hill Trucking Project (PA-1500168) <br /> SJMSCP Incidental Take Minimization Measures <br /> (APN: 253-120-25) <br /> Date: February 18,2016 <br /> Findings: No Species on Site <br /> Total Disturbed Acres Anticipated: 4.06 acres <br /> Habitat Types to be Disturbed: Agricultural(C34)and Urban(U) Habitat Land <br /> Project Jurisdiction: San Joaquin County <br /> Advisory Statements <br /> After inspecting the project site, and project site conditions, the San Joaquin Council of <br /> Governments (SJCOG) provides the following advisory statements to the applicant. No <br /> further action is required with the SJCOG with respect to the following statements. SJCOG <br /> does not accept any liability for the accuracy of these statements since each regulatory <br /> agency discussed below must determine the extent of its own regulatory authority with <br /> respect to the proposed project. <br /> It should be noted that two important federal and state agencies (U.S. Army Corps of Engineers <br /> and the California Regional Water Quality Control Board)and California Department of Fish and <br /> Wildlife Streambed Alteration requirements have not issued permits to the SJCOG and so <br /> payment of the fee to use the SJMSCP will not modify requirements (1600/1602) now imposed by <br /> these agencies. If potential waters of the United States [pursuant to Section 404 Clean <br /> Water Act] may occur on the project site, it therefore may be prudent to obtain a preliminary <br /> wetlands map from a qualified consultant. If waters of the United States are confirmed on the <br /> project site, the Corps and the Regional Water Quality Control Board (RWQCB)would have <br /> regulatory authority over those mapped areas [pursuant to Section 404 and 401 of the Clean <br /> Water Act respectively] and permits would likely be required from each of these resource <br /> agencies prior to impacting these features on the project site. <br /> The ITMM is not deemed complete until finalized by SJCOG, Inc. staff and provided back to the <br /> project. <br />