Laserfiche WebLink
KRIS P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> .� <br /> w' '{ <br /> DIRECTOR <br /> STO 68.300 CALIFORNIA 98201 <br /> -29 <br /> M1 (209)469-30lg FAX(208)468-2999 <br /> www.$)gov.orglpubworks <br /> MICHAEL SELLING <br /> DEPUTY DIRECTOR vfafkias f®rr YOU <br /> FRITZ BUCHMAN _ <br /> DEPUTY DIRECTOR <br /> JIM STONE <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> January 20,2016 <br /> MEMORANDUM <br /> TO: John L.Funderburg,Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> FROM: Alex Chetley,Engineering Services Manager 749/ <br /> Development Services Division <br /> SUBJECT: PA-1500266;A Site Approval application to expand an existing truck parking facility to include <br /> truck repair that is open to the public. The project includes the construction of a new 22,267 square <br /> foot building with offices,truck repair area,and storage on the undeveloped portion of the 26.3-acre <br /> site; located on the east side of Harlan Road 2,700 feet north of Roth Road,south of Stockton. <br /> (Supervisorial District 1) <br /> PROPERTY OWNER Howard Land Co,LP APPLICANT: WME Architects <br /> ADDRESS: 101 E.Transportation Court,French Camp APN: 193-270-18 <br /> INFORMATION: <br /> The site is currently located within a Federal Emergency Management Agency Designated Flood Hazard Area <br /> designated as Zone X(shaded). <br /> The site is within the Phase 2 area of the National Pollutant Discharge Elimination System(NPDES). <br /> Harlan Road has an existing and planned right-of-way width of variable width. <br /> RECOMMENDATIONS: <br /> 1. An encroachment permit shall be required for any work within road right-of-way. (Note:Driveway <br /> encroachment permits are for flatwork only—all vertical features,including but not limited to fences,walls, <br /> private light standards,rocks,landscaping and cobbles are not allowed in the right-of-way.)(Development <br /> Title Sections 9-1145.4 and 9-1145.5) <br /> 2. The Traffic Impact Mitigation Fee shall be required for this application. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July I of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br />