Laserfiche WebLink
lia <br /> WM <br /> Photograph 15: Looking northwest at western parking lot of Parcel 1. <br /> 1 <br /> Photograph 16: Looking south from Parcel 1 at stormwater basin located off Site. Stormwater drains from <br /> Parcel 1 and Parcel 2 to this retention basin. <br /> PROJECT No. 20172543 SITE PHOTOGRAPHS <br /> FIGURE <br /> DRAWN BY: AW Parcel 1 <br /> CHECKED BY: DH Phase I Environmental Site Assessment <br /> KL E/NFEL DER Delta Trucking Center, Parcels 1 and 3 <br /> Bright People. Right Solutions. DATE: 2016-10 Parcel 1: 101 East Transportation Court 1 3 <br /> and 10182 Harlan Rd <br /> REVISED: Parcel 3: 161 East Transportation Court <br /> French Camp, CA 95231 <br />