Laserfiche WebLink
T f,: <br /> i <br /> Photograph 27: View looking north at concrete pad on Parcel 3 just beyond fence where diesel spill and <br /> clean-up area was reported. Picture taken from same approximate location as previous Photo 26. Current <br /> tenant truck trailers and main structure noted in the background. <br /> Photograph 28: View looking southwest at large asphalt cut-out associated with removal of fueling <br /> island/cement pad in same general area as two prior Photographs 26 and 27 on Parcel 3. <br /> PROJECT NO. 20172543 SITE PHOTOGRAPHS <br /> FIGURE <br /> DRAWN BY: AW Parcel 3 <br /> CHECKED BY: OH Phase I Environmental Site Assessment <br /> (OKLINF-EL OER Delta Trucking Center, Parcels 1 and 3 <br /> Bright People.Right Solutions, DATE: 2016-10 Parcel 1: 101 East Transportation Court 19 and 10182 Harlan Rd <br /> REVISED: Parcel 3: 161 East Transportation Court <br /> French Camp, CA 95231 <br />