My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008068 SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRETHEWAY
>
22275
>
2600 - Land Use Program
>
PA-0900260
>
SU0008068 SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:20 AM
Creation date
9/9/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU0008068
PE
2631
FACILITY_NAME
PA-0900260
STREET_NUMBER
22275
Direction
N
STREET_NAME
TRETHEWAY
STREET_TYPE
RD
City
ACAMPO
APN
01726044
ENTERED_DATE
1/25/2010 12:00:00 AM
SITE_LOCATION
22275 N TRETHEWAY RD
RECEIVED_DATE
1/25/2010 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TRETHEWAY\22275\PA-0900260\SU0008068\NL STDY.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The maximum average daily flow for the Site was estimated 453.5 - <br /> Oat ,457.65 <br /> ns per <br /> day (gpd). Through the use of a weighted average, the averageall the <br /> different effluent flows and concentrations was determined to be <br /> gallons per day. Please see the following tables that present the information in a <br /> tabular form. <br /> Table 4. Average Daily Flow Calculation <br /> Use Units Rate Subtotal_ Reduction Average DailyFlow <br /> Existing 3 bed 120 gallbrlday 360 gpd None 360 gallons per <br /> Residence rooms day <br /> Potential <br /> Future 2 bed 240 gallons per <br /> Second rooms 120 gal/brlday 240 gpd None day <br /> Dwelling Unit <br /> Wnery Staff 3 staff 13 39 gallons per <br /> (7 days) gal/staff 39 gpd None day <br /> Winery <br /> Customers 10 cost 5 gal/oust 50 gpd None 50 gallons per <br /> day <br /> (7 days) <br /> Marketing <br /> Event 50 cust 5 gal/cust 250 gpd 81365 5.48 gallons per <br /> Customers day <br /> (8X per year) <br /> Special <br /> Event 50 cost 5 gallcust 250 gpd 41365 2.74 gallons per <br /> Customers day <br /> (4X per year) <br /> Special 0.43 gallons per <br /> Event Staff 3 staff 13 gal/staff 39 gpd 41365 day <br /> (4X per year) <br /> Reduction factors convert calculated flow into average daily flow over a year. This needs to be taken into account <br /> since special events only take place periodically. No reduction is used for a residence since it is continuously <br /> occupied. <br /> LOGE1003 Page 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.