My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0007559
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TURNER
>
5852
>
2600 - Land Use Program
>
PA-0900009
>
SU0007559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:07 AM
Creation date
9/9/2019 10:48:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0007559
PE
2626
FACILITY_NAME
PA-0900009
STREET_NUMBER
5852
Direction
W
STREET_NAME
TURNER
STREET_TYPE
RD
City
LODI
APN
02512001
ENTERED_DATE
1/30/2009 12:00:00 AM
SITE_LOCATION
5852 W TURNER RD
RECEIVED_DATE
1/30/2009 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\TURNER\5852\PA-0900009\SU0007559\APPL.PDF \MIGRATIONS\T\TURNER\5852\PA-0900009\SU0007559\CDD OK.PDF \MIGRATIONS\T\TURNER\5852\PA-0900009\SU0007559\EH COND.PDF \MIGRATIONS\T\TURNER\5852\PA-0900009\SU0007559\CORRESPOND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLANNING COMMISSION AGENDA - TENTATIVE 06/18/09 <br /> TIME FILE NO. APPLICATION AND DESCRIPTION STAFF DIST. <br /> PA-0900067 VR JEFFREY & KIMBERLY ALBIN ETAL/MICHAEL HAKEEM (VARIANCE KS <br /> APPLICATION TO ALLOW FOR TWO PARCELS BELOW THE ZONE MINIMUM IN <br /> THE AG-40 ZONE. PARCEL ONE TO CONTAIN 7.9 ACRES AND PARCEL TWO <br /> TO CONTAIN 9.4 ACRES - LOCATED ON THE EAST SIDE OF DUSTIN ROAD <br /> ON THE NORTH SIDE OF THE INTERSECTION OF PELTIER ROAD (NORTH OF ' <br /> LODI) <br /> PA-0800061 SA GOLLAPUDI, RAM P & SAILAKSHMI (REVISED: A SITE APPROVAL MH <br /> APPLICATION FOR A RELIGIOUS ASSEMBLY WITH A MAXIMUM CAPACITY OF <br /> 249 PEOPLE TO BE BUILT IN TWO PHASES OVER TEN YEARS. (USE TYPE: <br /> RELIGIOUS ASSEMBLY-NEIGHBORHOOD) PHASE ONE CONSISTS OF THE <br /> CONSTRUCTION OF A 6,058 SQUARE FOOT MULTIPURPOSE BUILDING WHICH <br /> CONTAINS A PRAYER HALL AND CONFERENCE ROOM. PHASE TWO, TO BE <br /> COMPLETED IN TEN YEARS, CONSISTS OF THE ADDITION OF 7,784 <br /> SQUARE FEET TO THE MULTIPURPOSE BUILDING FOR CLASSROOMS <br /> (RELIGOUS STUDY) , LIBRARY, AND A COMMUNITY ROOM - LOCATED ON <br /> THE EAST SIDE OF CORRAL HOLLOW ROAD AT LARCH ROAD (NORTH OF <br /> TRACY) <br /> PA-09-00096 SU ACAMPO ARBOR LIMITED LP ETAL/SID GOLDSTIEN CIVIL ENGINEER, INC. JJ <br /> (MAJOR SUBDIVISION APPLICATION TO CREATE A 173 UNIT CONDOMINIUM <br /> PROJECT IN AN EXISTING MOBILE HOME PARK - LOCATED ON THE <br /> NORTHEAST CORNER OF WOODBRIDGE ROAD AND ST RT HWY 99 E FRONTAGE <br /> ROAD, NORTH OF LODI) <br /> QX-89-0003 ALEGRE TRS/FTG CONSTRUCTION MATERIALS, INC. (REVISION OF KS <br /> APPROVED ACTION TO A QUARRY EXCAVATION PERMIT, TO EXTEND QUARRY <br /> OPERATIONS AN ADDITIONAL 20 YEARS, TO EXCAVATE APPROXIMATELY <br /> 100,000 YARDS OF SAND DEPOSITS - LOCATION BETWEEN KASSSON ROAD <br /> AND THE WEST BANK OF THE SAN JOAQUIN RIVER, 1.7 MILES <br /> NORTHWEST OF DURHAM FERRY ROAD. (SOUTHEAST TRACY) <br />
The URL can be used to link to this page
Your browser does not support the video tag.