Laserfiche WebLink
i ' S J C O G, Inc. ' <br /> 555 East Weber Avenue • Stockton,CA 95202 • (209)235-0600 • FAX(209)235-0438 <br /> 1 <br /> San Joaquin County Multi-Species Habitat Conservation&Open Space PIan (SJMSCP) <br /> SJMSCP RESPONSE TO LOCAL JURISDICTION (RTLJ) = j <br /> ADVISORY AGENCY NOTICE TO SJCOG,Inc. I <br /> To: Mo Hatef,San Joaquin County Community Development Department <br /> From: Anne—Marie Poggio,.Regional Habitat Planner, SJCOG, Inc. <br /> Date: March 15,2010 a. <br /> Local Jurisdiction Project Title: NIA <br /> Assessor Parcel Number(s): 015-050-41 --t y Local Jurisdiction Project Number: PA- 1000051 <br /> Total Acres to be converted from Open Space Use: 2.69 acres <br /> Habitat Types to be Disturbed: Multi-Purpose Habitat Land <br /> Species Impact Findings: Findings to be determined by SJMSCP biologist. i <br /> i <br /> Dear Mrs. Hatef: <br /> SJCOG, Inc. has reviewed application PA- 1000051: This project includes a Site Approval application for a small winery ! <br /> that includes the conversion of a second unit dwelling into a 550 square foot-tasting room and a 701 square foot wine <br /> making area. The project is located on the north side of Turner Road, 2,800 feet east of Davis Road, west of Lodi. A <br /> portion of this project is considered existing and does not require coverage under the SJMSCP (Maps attached). Areas <br /> outside the designated location are subject to the SJMSCP. <br /> San Joaquin County is a signatory to San Joaquin County..Multi-Species Habitat Conservation and Open Space Plan <br /> (SJMSCP). Participation in the SJMSCP satisfies,requirements of both the state and federal endangered species acts, ! <br /> and ensures that the impacts are mitigated below a,level of significance in compliance with the California Environmental <br /> Quality Act (CEQA). The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take. <br /> Minimization Measure are properly implemented and monitored and that appropriate fees are paid in compliance with the <br /> SJMSCP. Although participation in the SJMSCP is voluntary, Local Jurisdiction/Lead Agencies should be aware that if, <br /> project applicants choose against participating in the SJMSCP, they will be required to provide alternative mitigation in an <br /> amount and kind equal to that provided in the SJMSCP. T <br /> This project is subject to the SJMSCP and is located within the unmapped land use area. Per requirements of the <br /> SJMSCP, unmapped projects are subject,to case-by-case review.'This can.be'a 90 day process and it is recommended <br /> that the project applicant contact SJMSCP staff as early as possible. It is also recommended that the project applicant <br /> obtain an information package. http://www.sicog.org <br /> After this project is approved by the Habitat Technical Advisory Committee and the SJCOG Inc. Board, the following <br /> process must occur to participate in the SJMSCP: <br /> ■ Schedule a SJMSCP Biologist to perform a pre-construction survey prior to any ground disturbance j <br /> ■ Sign and Return Incidental Take Minimization Measures to SJMSCP staff(given to project applicant after <br /> pre-construction survey is completed) <br /> Pay appropriate fee based on SJMSCP findings. Fees shall be paid in the amount in effect at the time ! <br /> of issuance of Building Permit <br /> ■ Receive your Certificate of Payment and release the required permit <br /> It should be noted that if this project has any potential impacts to waters of the United States(pursuant to Section 404 Clean Water Act] <br /> it would require the project to seek voluntary coverage through the unmapped process under the SJMSCP which could take up to 90 <br /> days. It may be prudent.to obtain a preliminary wetlands map from a qualified consultant. If waters of the United States are confirmed <br /> on the project site, the Corps and the Regional Water Quality Control Board(RWQCB) would have regulatory authority over those <br /> mapped areas[pursuant to Section 404 and 409 of the.Clean Water Act respectively]and permits would be required from each of these <br /> resource agencies prior to grading the project site. <br /> I <br /> If you have any questions, please call (209) 235-0600. <br />