Laserfiche WebLink
i- <br /> Rick Griffin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-1000051 (SA) <br /> 4. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-00-433) <br /> 5. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application. The fee will be based on the current schedule at the time of payment. <br /> (Resolution R-06-38) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 7. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met the <br /> requirements of the Waste Plan Format for Development Projects, Final Site Plan is required upon submittal <br /> of verification. <br /> 8. The developer shall provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging onto <br /> other properties and to prevent offsite sediment transport. Retention basins shall be fenced with six(6)foot <br /> high chain link fence or equal when the maximum design depth is 18 inches or more. Required retention basin <br /> capacity shall be calculated by a registered civil engineer, licensed contractor or licensed architect prior to <br /> release of Building Permit. (Development Title Section 9-1135) <br /> 9. The proposed project shall follow the practices in the County"Small Site Storm Water Management Plan". <br /> Informational Notes: <br /> (i) This property is subject to the requirements of San Joaquin County Mosquito&Vector Control District(209- <br /> 982-4675)and the California Health and Safety Code for the prevention of mosquitoes.Best Management <br /> 4 Practices(BMP) guidelines for stormwater devices, ponds and wetlands are available. <br /> (ii.) All future building permits for projects located within a Special Flood Hazard Area at the time of permit <br /> issuance shall meet the San Joaquin County flood hazard reduction requirements(Title 9, Chapter 9-1605) <br /> and all requirements of the State of California(CCR Title 23)that are in force at the time of permit issuance. <br /> As an example,these requirements may include raising the finish floor elevation one foot above the expected <br /> flood level and/or using flood resistant materials. <br /> AC:BD: DS <br /> 11Sjpwgov.or&hares\DevSmicesOPubSery%COMMENTS1SA\YR 20101PA-10000511PA-1000051.doc <br /> t <br />