Laserfiche WebLink
S = Sufficient <br /> 1 — Insufficient <br /> S I 6.0 PERCOLATION TEST INFORMATION SECTION <br /> r ' <br /> .❑ ❑ 6.1 Site map showing the location,witty concise and accurate dimensions of the percolation test holes on the parcel. <br /> S {, Z <br /> ❑ ❑ 6.2 The minimuminumber of shallow and deep percolation tests was performed for each parcel. <br /> ❑ b <br /> 6.3 Description the date,time and protocol used to prepare the test hole, including depth and dimensions of hole, <br /> preparation of pole,and depth of water used to presoak(minimum 12 inches). <br /> ❑ 6.4 Description of the7date,time and condition of the test hole after the 24-hour soak period(hole still intact,hole dry, <br /> depth to water remaining in hole,etc.) <br /> to 1❑ 6.5 The test conformed to SJC Policy EHD 02-02(correct depth,diameter, 2"gravel,6"water refill, correct readings <br /> recorded). 1 <br /> '51 <br /> 6.6 Complete Percolation Test Form(including readings)was provided with REHS verification signature. The rate <br /> was correctly calcul ted using the last reading. <br /> tEp El �y s <br /> 6.7 Discussion of any po tial problems predicted and/or the need for an engineered or alternative septic system. <br /> R ❑ 6.8 Discussion of percolation rates in relation to the type, size and location of future leach fields needed at the site. <br /> f <br /> 7.0 CONCLUSION SiCTION , <br /> 9_ ❑ 7.1 The report was signed and stamped by the appropriately registered individual <br /> r— <br /> Reviewed By: Reviewed Date: <br /> f <br /> i <br /> i <br /> i <br /> EHD 26-02-003 Page 2 of 3 Soil Suitability Checklist <br /> �„•r�nnv <br />