Laserfiche WebLink
to <br /> Chandler Martin -2- <br /> COMM=Y DEVELOPMENT <br /> PA-05-729 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is $833.00 per 1,000 gross square foot of building <br /> designated as Manufacturing or$216.55 per additional daily trip-end generated in the Tracy area. The fee <br /> shall be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) (Resolutions 00433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066) that this development has met the <br /> requirements of the Waste Pian Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. This project will be subject to Regional Traffic Impact Fees. The fees shall be based on current schedule. <br /> 7. All new structures and/or substantial improvements shall be raised one(1)foot above the 100-year flood <br /> elevation of seven 7 feet NGVD. <br /> Note: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> PA00MMRNTWA%YR 20051PA-0560729(revised).wpd - <br /> l <br />