Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-05-729 (SA) <br /> 3. The Traffic Impact Mitigation Fee shall be required for this development: The fee.is due and payable at the <br /> .time of building permit application. (The fee currently'is $$33.00 per 1;000 gross square foot of building <br /> designated as Manufacturing or$216.55 per additional daily trip-end,generated in the Tracy area. The fee- <br /> shall <br /> eeshall be automatically adjusted July I of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) (Resolufions 00433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division (468-3466)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 6. This project will be subject to Regional Traffic Impact Fees. The fees shall be based on current schedule. <br /> Note: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> HCOMMHNTS1SANYR 20051PA-0500729(rev descp).wpd <br />