Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> MS-96-228/SA-96-69 <br /> 3 <br /> SA-96-69 <br /> 1. The Traffic Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable at the time of building permit application. <br /> (The fee currently is $572 . 00 per 1, 000 gross square foot of building <br /> as Manufacturing or $148 . 67 per daily trip-end generated in the Manteca <br /> area. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News <br /> Record. ) Contact the Department of Public Works Public Facilities <br /> Division ( (209) 468-3055) for any alternate method of payment allowed <br /> for expansions/phasing. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> 2 . Encroachment permit shall be required for work within road right-of-way. <br /> (Development Title Section 9-1145 .4) <br /> 3 . The driveway approach shall be improved in accordance with the <br /> requirements of San Joaquin County Standards R-17 prior to issuance of <br /> the occupancy permit. <br /> (Development Title Section 9-1145 .5) <br /> RWH:ne <br /> PS-6A123.N7 <br /> E: Manuel Lopez, Deputy Director/Development <br />