Laserfiche WebLink
____- SA-01-78 \Wllr <br /> Page 2 of 2 <br /> Submit three (3) sets of building plans for review and approval prior to issuance <br /> 0 of building permits to the Environmental Health Division. Plans shall include the <br /> design of the entire dairy facility (milking barn, corrals, free stall housing, shelter <br /> sheds, dry cow facilities, calf barns, and waste water ponds); California Food and <br /> A.g-ricultural Code, Division 15, Chapter 5, Article 2, Section 33481-33487. A <br /> $890.00 pl n check fee is required at the time of submittal. <br /> NOTE: The proposed round milk-barn plans will require California State Milk and Dairy <br /> Foods Control Approval prior to issuance of buildin ermits. <br /> 6� D. Applicant shall prepare a detailed schematic showing all milking equipment (tank, <br /> pipeline, etc...) in milk-barn and milk-house prior to installation approval by <br /> Environmental Health Division. A plan review fee of$445.00 shall accompany <br /> these plans per Board of Supervisors Resolution 90-620. <br /> p E. Install an approved back-flow prevention device on the water supply systems) <br /> (California Code of Regulations, Title 17, Section 7603). <br /> NOTE: The water supply to the dairy barn must be protected from all outside sources by <br /> use of reduced pressure backflow devices (R/P)''All water hose bibs must have <br /> backflow devices, and R/Ps are required at all chemica `injection sites. <br /> F. The Environmental Health Division is recommending the installation of <br /> monitoring wells on this dairy facility for ongoing groundwater monitoring of <br /> nitrates, Total Dissolved Solids (TDS), phosphates, etc. The final determination <br /> of the installation of these wells and the monitoring required is subject to Central <br /> Valley Regional Water Quality Control Board approval. <br /> G. All liquid and solid dairy wastes from this operation are to be retained on the <br /> premises so as not to cause a nuisance or a health problem (Porter-Cologne Water <br /> Quality Control Act, Chapter 4, Article 4, Section 13260-13263). <br /> H. All liquid and solid dairy wastes and vector problems associated with this dairy <br /> operation are to be retained on the premises so as not to cause a nuisance or a <br /> health problem (Porter-Cologne Water Quality Control Act, Chapter 4, Article 4, <br /> Section 13260-13263). Any complaints that are verified against this site will be <br /> charged the Environmental Health Division hourly rate of$89.00 for response and <br /> correction as per Board of Supervisors Resolution B-92-159 . <br /> I. Construction of individual sewage disposal system(s) for the milk-barn septic <br /> GK system under permit and inspection by the Environmental Health Division is <br /> required at the time of development (San Joaquin County Development Title, <br /> Section 9-1110.3 & 9-1110.4). <br />