Laserfiche WebLink
>PV In <br /> APPLICATION - USE PERMIT <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> ••:••-`.:-•g�"' FILE NUMBER: UP- <br /> Ezlstin Roads f _ <br /> i Road/Street Name R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> Valpico Road 50 22 Yes El No Yes No® <br /> Yes❑ No❑ Yes❑ No❑ <br /> Surrace.Trari•s oitation Assistance Act(ST AA)trucks <br /> Will STAA type trucks,over California Legal length,be used as part of the proposed operation? <br /> Yes❑ (if yes,the applicant must provide a letter requesting designation of the proposed facility as an STAR terminal.) <br /> No <br /> ENVIRONIV I I J INFORMATION <br /> USE ADDITIONAL PAPER,IF NECESSARY _ <br /> " ' ' Wats%Dralnege and-Flooding "" -' :" <br /> Describe any areas subject to flooding(Include flood depths and flood panel map number): <br /> NA <br /> Describe the current depth of the ground water and depth to potable water. <br /> Ground water at approx. 55 feet, potable water at approx. 100 feet <br /> Describe any existing drainage courses or eroded areas on or near the project site(e.g.rivers,creeks,swales or drainage ditches): <br /> NA <br /> <- " Land,Land UseandBiota - -' •7777= <br /> . <br /> - :.. <br /> Describe the site's topography(e.g.land forms,slopes,etc.): <br /> Flat with 15 feet of fall from southwest to northeast <br /> Describe agricultural land that will be lost as a result of the project(type of crops,acres,quality of soil,etc.): <br /> Property has been fallow for at least the last 5 years. In Byron Bethany Irrigation <br /> District but CVP water with very low reliability. <br /> Describe any wildlife habitat on-site and species that are of may be present: <br /> Not aware of any <br /> Describe any vegetation on-site by type and extent: <br /> Typical grasses and weeds <br /> Quality• <br /> Describe air pollutants that may result from the project(e.g.construction related dust,vehicle trips per day,fire places incinerators, <br /> etc. : Initial construction will include grading and burial of first phase vaults. ongoing operations <br /> will include approximately 150-200 burials annually. Typical burial will entail clearing sod and 18 <br /> inches of soil to uncover the vault. The soil will typically be moist and generate very little dust. <br /> Please refer to Attachment R for vehicle trips per day. <br /> PMEVSVCtPlanning Application Fo,ms%Use Permit.(Revised 02-03-10) Page 4 of 9 <br /> l <br /> I <br />