Laserfiche WebLink
ATTACHMENT A <br /> The Tracy Public Cemetery District(TPCD)currently operates a 20 acre cemetery at the <br /> coiner of MacArthur Blvd and Schulte Road in Tracy. The existing cemetery currently <br /> has an office and maintenance building on site. Tliere is an approximately 10 year supply <br /> of gravesites at the current site. <br /> TPCD plans to begin construction of the first phase at the new site in 2012 so they can <br /> offer gravesites to the public at both the new and existing cemetery sites. "TPCD plans to <br /> run all administrative functions from the existing site until it is close to reaching capacity, <br /> estimated in approximately 10 years. At that time,the office building would be built at <br /> the new site and administrative functions would be moved to the new site. <br /> The first phase would include the maintenance facility that will include an office and two <br /> bathrooms. The office would be the location of any on-site meetings with customers,and <br /> the bathrooms would be for employee and customer use. Upon construction of the office <br /> in later phases,one bathroom would be converted to storage and the office in the <br /> maintenance facility will be used for maintenance functions. <br /> As noted on Attachment 13, TPCD has had an average of approximately 200 funeral <br /> services per year over the last five years,with a declining;trend. The trend is expected to <br /> flatten out,and as the population in Mountain House increases and ages along with <br /> increasing population in Tracy,the trend should very gradually trend upwards. <br /> Cremations are also trending upwards as a percentage of the total services,currently <br /> sitting at approximately 113 of the services. Nationally cremations are trending upwards, <br /> and it is anticipated they will soon be more than 1/2 of all services. This is why TPCD has <br /> planned for approximately one half of the gravesites at buildout to be cremain niches. It <br /> is anticipated the 20 acre site will yield a total of approximately 62,890 grave sites and <br /> cremain niches. <br /> A common practice among cemeteries is to pre-install the burial vaults. This allows the <br /> vaults to be buried very close to each other,and minimizes the ground disturbance and <br /> labor for future burials. TPCD anticipates pre-installing sections of vaults as demand <br /> necessitates. <br /> Buildings and structures in the cemetery will be built in 2 phases. Phase 1 will include <br /> the maintenance building which will be constructed within 18 months of CUP approval. <br /> Phase 2 includes the office building and committal shelter. These two buildings will be <br /> built within 10 years of CUP approval. They may be built at the same time or at separate <br /> times,but within the ten years. A graphic depicting the 2 phases follows. <br />