Laserfiche WebLink
SAN JOAQUIN- COUNTY <br /> RESTRICTED MATERIALS PERMIT CONDITIONS <br /> PERMITTEE: PERMIT NO: 706 <br /> CONDITION X. COND ION <br /> >GURADAN CIiEMIGATION OF GRAPES Paraquat dichloride (Gramoxone) <br /> A CERTIFICATION AND TRAINING <br /> Persons working as applicators or flaggers (except <br /> 1. Each person prior to handling Furadan 4F for use on grapes must become <br /> "Certified trained"by attending training provided by the registrant. All records applicators'working. in an enclosed cab or f laggers workiiig <br /> of attendance and training shall be maintained by the employer.. <br /> . -in `an enclosed. vehicle) shall wear a dust .mist respirator <br /> 2.:: During all"handling'activities"Handlers"musthave in:possession, proof that <br /> they received the training and are"certified trained' <br /> - A.. - <br /> . ,..,a r.ov.ed b :'MSHA NTOEi:� number. xefix� TC `84�A "•, . -. ~' <br /> B. APPLICATION REQUIREMENTS <br /> 1:. Apply a minlmurn of ten gallons of water per vine through drip(trickle): <br /> emitter. <br /> 2. no not apply Furadan 4F for at least seven days after harvest to.allow berries <br /> on the ground to dry{ralsined). <br /> 1' For post-harvest drip-irrigations, apply up to a rnaxirnum of two applications:: <br /> of three quarts per acre, or up to a maximum of three applications of two <br /> quarts per acre only. <br /> 4. After the application and„irrigation in soils where puddling is known to occur, . <br /> look for,and eliminate, puddles; or enough time must be allowedto ensure <br /> dissipation of puddles two hours prior to sunrise, <br /> $. No daylight irrigation,is to occur until the minimum gallonage is applied, or at. <br /> least 21 days after Furadan.4F application. <br /> 8: A"certified trained' person shall be at the application site during the <br /> application and until the flushing of the lines is completed. The"certified <br /> trained'person shall shut the system down and make necessary adjustments <br /> should the need arise. <br /> 7. Within 24-hours of the completion of the application and flushing,the <br /> property owner will survey the entire treated area for dead birds. Carcasses <br /> will be held under refrigeration and given to the agricultural commissioner's <br /> office or disposed of as directed by,the agricultural commissioner. _. <br />