Laserfiche WebLink
APPLICATION- GRADING EXCAVATION <br /> SAN JOAQUIN COUNTY COMMUNITY DEVELOPMENT DEPARTMENT <br /> NNW2 'i .r y 9/ � 'sir�x x '. u.zr aY � u&.z.ca.ol <br /> .F BUIF DIN(i5 ANDTRUCTtI.HE$ r '. <br /> ¢..... o: ..•8 X33 e vi arYo 2ffi• &?✓ • - ?W .: <br /> (Chiuomtetfan may i»a._ smt[1eglta Cfj a <br /> Structure NumberProposed Use Ground Floor Area Highest Floor Overall Height on <br /> feeq <br /> 140a + S <br /> �So'A-� 300t /,Z- <br /> 3 <br /> Z3 B 06 O <br /> 1 4-'z a 0 1o <br /> • Tha'structure number'should be used In Identifying the structure on the Site Plan. <br /> •• if there we two or more proposed uses In a building, make separate listings for each use. For residential buildings, state <br /> the number of units In each structure. <br /> Domastfp;lNaler: ' <br /> Public Water Service Provider Annex-Formation Distance to Public <br /> Proposed❑ <br /> Existing❑ Required Water (Peep <br /> Private Water Existing Well New Wall ❑ Well Replacement ❑ <br /> 77777 <br /> Sewage btsposat fCgY',,.'�`,"' <br /> Public Sewage Service Provider Annex-Formatlon Distance to Public <br /> Disposal Required Sewer Facility <br /> Proposed❑ <br /> Existing ❑ <br /> On-site Sewage Existing Septic System New Septic System ❑ Other ❑ <br /> Disposal <br /> Storm Drainage <br /> Public Storm Service Provider (if Public) Annex-Formation Terminal Drainage Detention- <br /> Drainage Required to: Retention Ponds <br /> Proposed❑ <br /> Existing❑ <br /> Private Storm On-sRe Retention Pond(s) ❑ Natural Drainage/No Change Other ❑ <br /> Drainage <br /> £:dating Roads xis y:' <br /> Road/Street�Name n R.O.W.Width Pavement Width Curb/Gutter Sidewalks <br /> Yes❑ Nl�r Yes❑ No <br /> Yes ❑ No❑ Yes❑ No❑ <br /> Yes❑ No❑ Yea❑ No❑ <br /> A :: s s s "'�E=av tIGt1��TllaCte[1611Ca x <br /> Excavation Area (Acres): �5.. 8 Fill Area (Acres): <br /> Existing Site Elevation (Average at 100'Intervals): <br /> Proposed Site Elevation (Average at 100'Intervals): 9 <br /> Perimeter Elevation (Average at 100' Intervals, 5'from Property Line): 5, <br /> Perimeter Elevation (Average at 100'Intervals, 100'from Property Line): <br /> Amount of Material to be Removed (Cubic Yards): ( Q C <br /> Approximate Start Date: / ` Approximate End Date: -- <br /> Hours of Operation: 21,Al ._ 5. - Average Daily Truck Trips: 2r3 <br /> -3- <br />