REVISED CWC SECTION 13308 TIME SCHEDULE ORDER NO. R5-2002-0014-RO l 11 - <br /> MUSCO OLIVE PRODUCTS AND THE STUDLEY COMPANY <br /> SAN JOAQUIN COUNTY <br /> 13: By 28 June 2002, the Discharger shall submit a report describing the additional steps it has taken <br /> to minimize offensive odors due to the land application of wastewater..The penalty shall be <br /> $5,00.0 for-each day in which this report is late or incomplete. <br /> 14. By 10 July 2002, the Discharger shall submit a report describing whether groundwater monitoring <br /> well MW-9 is capable of being consistently used as a groundwater monitoring point. The penalty <br /> shall be $2,500 for each day in which this report is late or incomplete. <br /> 15. As of 15 July 2002, neither irrigation tailwater nor process wastewater shall be discharged to, or <br /> ponded within,the surface water drainage course. This requirement does not apply to the 114 <br /> million gallon storage pond. Each day of violation after 15 July 2002 shall result in a penalty of <br /> $2,500.per day. _ <br /> 16. By 15 August 2002, the Discharger shall submit a report showing that the pond and tailwater <br /> system have been fully constructed and are operational. The report shall also describe the pond <br /> construction details and show that a liner, adequate to prevent the stored wastewater from <br /> impacting the groundwater, has been installed. The penalty shall be $5,000 for each day after <br /> 15 August 2002 in which the pond and/or tailwater system are not operational. <br /> 17. By 31 July 2002, the Discharger shall submit a report presenting the results of a second <br /> groundwater samplingevent of all existing groundwater monitoring wells. Samples shall be <br /> analyzed for the same constituents as those in the April 2002 monitoring event. The penalty`shall <br /> be $2,500-for each day in which this..report is late or incomplete.. <br /> 18. Effective 7 September 2002, the Discharger shall be continuous compliance with the daily'flow <br /> limit of 500,000 gpd discharged to land (as described in WDRs.No. 97-037). The.500,000 gpd <br /> shall be the sum of daily applied wastewater and any tailwater that has been collected and <br /> F reapplied to the land. Each day of violation after 7 September 2002 shall result in a penalty of <br /> $2,500 per day of violation. <br /> 19. Effective 7 September 2002, the Discharger shall be in continuous compliance with the BOD and <br /> DIS daily maximum loading limits contained in Discharge Specification B.6 of WDRs No. <br /> 97-037. For each constituent,each day of violation after 7-September 2002 shaft iesult in a - <br /> penalty of$2,500 per day of violation. <br /> 20. All technical reports required herein that involve planning, investigation, evaluation, or design, or <br /> other work requiring interpretation and proper application of engineering or geologic sciences, <br /> shall be prepared by or under the direction of persons registered to practice in California pursuant <br /> to California Business and Professions Code sections 6735, 7835, and 7835.1. To demonstrate <br /> compliance with sections 415 and 3065 of Title 16, CCR, all technical reports must contain_a <br /> statement of the qualifications of the responsible registered professional(s). As required by these <br /> laws, completed technical reports must bear the signature(s) and scal(s) of the registered <br /> professional(s) in a manner such that all work can be clearly attributed to the professional . <br /> responsible for the work. <br />