Laserfiche WebLink
? . EAPTH : (Cc inuedl YES NO <br /> C . riill there be conversion of agricu Lural <br /> land ( consider prime farmland )? <br /> 3 . Plant/Animal Life: <br /> a. Will there be a reduction or disturbance <br /> to any habitat for plants and animals <br /> ( including removal or disturbance of <br /> trees , riparian areas , or migration <br /> routes)? <br /> b. Will the project impact any rare , <br /> endangered , or threatened specieG <br /> located on or near the site? <br /> 4 . Air : <br /> Will the project result in deterioration of <br /> existing air quality , including creation of <br /> objectional odors ; will future project <br /> residents be subjected to significant <br /> pollution levels? <br /> 5 . Noise : <br /> a. Will the project expose people to high x <br /> noise or vibration levels? <br /> b. Will the project result in increased <br /> noise or vibration levels? <br /> 6 . Energy/Natural Resources/Hazards <br /> ( Consider the General Plan ) : <br /> a. Will the project result in anysignifi- <br /> cant consumption of energy? <br /> b. Will the project affect the potential x <br /> use , extraction , conservation , or <br /> depletion of a natural resource other <br /> than agricultural land? <br /> C . Will the project create a -risk of k <br /> explosion , release or exposure to <br /> hazardous substances , or other dangers <br /> to public health and safety? <br /> 7 . Utilities and Public Service: <br /> *a. Will the project require alteration <br /> of , addition to, or the need for <br /> utility systems--water , sewer , drainage , <br /> solid waste--including sphere of <br /> �t influence or district boundary change? <br /> Initial Study 7-90 <br /> -19- <br />