Laserfiche WebLink
r <br /> ENVIROMENTAL HEALTI)EPARTMENT <br /> SAN JOAQUIN COUNTY <br /> Unit Supervisors <br /> Ronna K.Heran,R.E.H.S. <br /> 30-1 East Weber Avenue, Third Floor Carl Borgan_R.E.H.S. <br /> N: Director mMike Huggins. R.E.H.S.. R.D.I. <br /> Al Olsen,R.E.H.S. Stockton, California 95202-2708 Douglas W. Wilson. R.E.H.S. <br /> • �Q. <br /> Program Manag>r Telephone: (209) 468-3420 Margaret I-agorio. R.E.H.S. <br /> crGpR� Laurie A.Cotulla,R.E.H.S. <br /> Fax: (209) 464-013$ Robert McClellon, R.E.H.S. <br /> Program Manager Mark Barcellos. R.E.H.S. <br /> January 5, 2005 <br /> To: San Joaquin County Community Development Department <br /> From: San Joaquin County Environmental Health Department' ' <br /> Contact Person: Greg Oliveira, Lead Senior R.E.H.S., PHONE: (209) 468-3854 <br /> RE: PA-04-699 (MS,Pre-application), SU004747, Attention: Kathy Allen <br /> 138 North Wagner Avenue, Stockton <br /> The San Joaquin County Development Title Requirements listed below have been identified as <br /> pertinent to this project. Other requirements may also apply. These requirements cannot be <br /> modified. <br /> A. A qualified environmental professional shall prepare a surface and subsurface contamination <br /> report, identifying any potential source of surface or subsurface contamination caused by past <br /> or current land uses. The report shall include evaluation of non-point source of hazardous <br /> materials, including agricultural chemical residues, as well as potential point sources, such as <br /> fuel storage tanks, septic systems, or chemical storage areas. If the report indicates there is <br /> contamination, corrective action shall be taken, as recommended in the report and concurred <br /> with by Environmental Health prior to issuance of the building permit (San Joaquin County <br /> Development Title, Section 9-905.12(a)(c)). <br /> B. Connection to a public sewer system is required at time of development (San Joaquin County <br /> Development Title, Section 9-1105.2(b)). <br /> C. Prior to the issuance of any building permits, sewer facilities shall either be bonded for or be <br /> in place, as evidenced by a letter from the serving entity(San Joaquin County Development <br /> Title, Section 9-1100.3(d)). <br /> D. Connection to an approved public water supply system is required(San Joaquin County <br /> Development Title, Section 9-1120.2) <br /> • A letter from the water supplier will be required stating that they have the capacity to <br /> serve the development and that the system meets State standards prior to recording the <br /> final map (San Joaquin County Development Title, Section 9-1100.3). <br />