Laserfiche WebLink
Referral , Page Two <br /> g. All recommendations of the soils. engineer that were , <br /> included in the sails report shall- be incorporated in the <br /> construction drawings: <br /> h. Provide a copy of the - Soils Report to the .Building <br /> Inspection Division. <br /> _. The proposed project is located within an expansive soil <br /> area where a conventional foundation may not be suitable. <br /> Therefore, an engineer is required to evaluate the <br /> foundation design. <br /> j . The proposed project.'; is located in a subsidence area <br /> where a conventional + foundation may not be suitable. <br /> Therefore, a complete soils report by a geotechnical <br /> engineer is required. ,, <br /> k. Provide a technical opinion and report to identify and <br /> develop methods ofprotection from the hazards presented <br /> by the hazardous material. (U. B. C. Section', 901 (F) <br /> 2 . A grading plan shall be submitted and approved and a grading <br /> permit issued by the Building Inspection Division prior to <br /> performing any excavation or filling of earth" material: <br /> a. A grading pian shall " contain the information listed in <br /> the U.B. C. , Appendix,'€Chapter 70, Section 7006 (1) . <br /> E <br /> b. The grading plan shallEinclude complete drainage details <br /> and elevations of': the "adjacent parcels. Retaining wall <br /> details shall be submitted where applicable.. <br /> C. Grading in excess of 5; 000 cubic yards shall". comply with <br /> i' Section 7014 for ",Engineered Grading Requirements. " <br /> v <br /> d. All recommendations of the soils engineer shall be <br /> incorporated in the grading plans. <br /> e. All compaction 'reports must be submitted '.prior to a <br /> foundation inspection.E1 <br /> - j <br /> f. All grading permits are subject" to approval by the other <br /> departments. <br /> g. All grading authorized by the permit shall -'be approved <br /> prior to issuance of any building permits, or beginning <br /> of any construction, <br /> Note: This application requires a discretionary approval, <br /> (e.g. Tentative Map, Site Approval; Use Permit) , Therefore, I <br /> a grading permit will; ':not ° be issued until this :approval is <br /> obtained. <br />