My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006277
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2434
>
2600 - Land Use Program
>
PA-0600529
>
SU0006277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:32:15 AM
Creation date
9/9/2019 11:02:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006277
PE
2631
FACILITY_NAME
PA-0600529
STREET_NUMBER
2434
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
APN
14128219
ENTERED_DATE
9/27/2006 12:00:00 AM
SITE_LOCATION
2434 E WATERLOO RD
RECEIVED_DATE
9/26/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2434\PA-0600529\SU0006277\APPL.PDF \MIGRATIONS\W\WATERLOO\2434\PA-0600529\SU0006277\CDD OK.PDF \MIGRATIONS\W\WATERLOO\2434\PA-0600529\SU0006277\EH COND.PDF \MIGRATIONS\W\WATERLOO\2434\PA-0600529\SU0006277\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Chandler Martin ;.� 4_2_. 1 t t `� _ T <br /> COMMUNITY DEVELOPMENT ` <br /> PA-06-529 (SA) _ t <br /> 4. The Regional Transportation Impact Fee shall be required for this development. The fee is due and <. .. <br /> payable'at the time of building permit application. (The fee currently is.$780.00 per.1000:gross square foot i <br /> of building designated as commercial. 'The fee.shall be automatically'adjusted July l of each yearby the_,�-- _ <br /> Engineering Construction Cost Index as published-by the Engineering NewsRecord.)-(ResolutionR-06-38) <br /> s�. <br /> 5. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee'is due <br /> and payable prior to issuance of the building permit. (The fee currently is$623.00 per 1.;000 gross square <br /> foot of building designated as Service Co=mmercial. The fee shall be automatically increased on January I <br /> of each year through the year 2005 at the rate of 7.66 percent.) .' <br /> (Development Title Section 9-818.4 and Resolutions R' 1-327, R-94-185 and R-97-5) <br /> 6. A copy of the Final Site Plan shall be submitted prior to release of building permit. t ' i <br /> 7. Verification shall be obtained from the Solid Waste Division (468-3066) that-this=development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site-Plan is required upon <br /> submittal of verification. <br /> 8. Existing street tree shall be relocated to an adjacent tree well.as approved by Public Works: ' <br /> 9. As per San Joaquin County Standard Chapter 2 Section 2.47 (c),no driveway shall be allowed within five <br /> (5) feet from the side property.line. . t k :.E , X P <br /> 10. On site auto washing must be drained through a sand/oil separator prior.to discharging into the terminal <br /> drainage system and shall be shown on the site plan. <br /> E <br /> NOTE: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:av <br /> P:ICOMMENTS4SAWR 2006TA-0600529.wpd <br /> Tf <br /> f fs, ♦iia.' — - r- "-- ..,;f'y3 <br /> t <br /> i <br /> _ I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.