Laserfiche WebLink
Thomas M. Gau -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-96-12 (SECOND REVISION) <br /> 3. The owner shall execute an Irrevocable Offer and Agreement to Dedicate Road for to re--t <br /> a 20'x20' corner cut-off(snipe) at the intersection of <br /> Waterloo Road and Sunset Avenue. (A $225.00 fee currently is required for processing per <br /> Development Title Table 9-240.2 in addition to a copy of the Grant Deed and a legal <br /> description of the parcel to be offered for dedication.) <br /> (Development Title Section 9-1150.5) <br /> 4. The frontage improvements!excluding sidewalk)for Sunset Avenue shall be constructed in <br /> conformance with the standards for one-half of a 50-foot right-of-way local residential street. <br /> with_ert:eat euro. Improvements shall include vertical curb and gutter and a handicap ramp at <br /> the corner of Waterloo Road. The construction of the frontage improvements will be deferred <br /> upon execution by the owner of a Deferred Frontage and Roadway Improvement Agreement or <br /> a Secured Deferred Frontage and Roadway Improvement Agreement with a deposit equivalent <br /> to their estimated construction costs prior to approval of the Improvement Pian. A $260.00 fee <br /> currently is required for processing per Development Title Table 9-240.2 in addition to a copy <br /> of the Grant Deed and an estimate for the required frontage improvements. The estimate shall <br /> be prepared by a Registered Civil Engineer with a typical section drawing on a farm to be <br /> supplied by the Department of Public Works and submitted to the Department of Public Works <br /> for approval. As an option, the Department of Public Works will prepare the drawing and <br /> estimate for an additional fee of$115.00. <br /> (Development Title Section 9-1150.2) <br /> 5. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $1,039 per 1,000 gross <br /> square foot of building as Service Commercial in the Stockton area. The fee shall be <br /> automatically adjusted July,I of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record.) A credit may be allowed for the previous use if it <br /> can be verified that the site has been used since April 23, 1990. <br /> (Resolutions R-90-304, R-91-1025, R-93-167, R-94-174 and R-95-650) <br /> 6. The City of Stockton shall verify that the sewer service has been paid for the proposed <br /> development. <br /> TIMI:RH:ne <br /> Ps-6D254.N 1 <br /> E: Manuel Lopez, Deputy Director/Development <br />