Laserfiche WebLink
ISI <br /> a <br /> Kerry Sullivan <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-71 E; <br /> San Joaquin County Standards CW-Ci 1 prior to issuance of the occupancy permit. <br /> (Development Title Section 9-1145.5) <br /> E <br /> 3, The Traffic Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable at the time of building permit application. (The fee currently is $1232.00 per <br /> 1,000 gross square foot of building designated as Service Commercial or$176.84 per <br /> additional daily trip-end generated in the Stockton area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by <br /> the Engineering News Record. €A credit may be allowed if it can be verified that the <br /> existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation Fee will be required for this development. <br /> The fee is due and payable prior to issuance of the building permit. (The fee currently is <br /> $456.00 per 1,000 gross square afoot of building designated as Service Commercial. The <br /> fee shall be automatically increased on January 1 of each year through the year 2005 at the <br /> rate of 7.66 percent. A credit may be allowed if it can be verified that the existing <br /> development on this site was inoperation on or after April 30, 1991.} <br /> (Development Title Section 9-818.4 and Resolutions R-91-327, R-94-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> f1 <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this <br /> development has met the requirements of the Waste Plan Format for Development, <br /> Projects. Final Site Plan is required upon submittal of verification. <br /> 7 <br /> tt' <br /> I <br /> f� <br /> ii <br /> I <br /> ke <br /> r.l <br /> P <br /> GK:ap <br />