My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002439
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
5749
>
2600 - Land Use Program
>
UP-89-23
>
SU0002439
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:14 AM
Creation date
9/9/2019 11:02:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002439
PE
2626
FACILITY_NAME
UP-89-23
STREET_NUMBER
5749
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
ENTERED_DATE
10/26/2001 12:00:00 AM
SITE_LOCATION
5749 E WATERLOO RD
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\5749\UP-89-23\SU0002439\PRIOR TO 2000.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Description <br /> This project is to open a public boarding stable. The <br /> renting, maintanance of the stalls and the feeding of the <br /> horses will be our service. The facility will include a <br /> covered arena, an outdoor arena and a horse trail thru the <br /> back 12 acres. The perimeter of the property will be <br /> completely enclosed with a five foot wire fence. <br /> There are two phases to the project . The first phase is to <br /> renovate and rent the existing 10 portable pipe stalls. The <br /> customers will have the existing outdoor arena and the back <br /> acres to ride in. The second phase, which is expected to <br /> begin in the fall of 1989, is to construct a 18 horse barn <br /> around a large covered arena. The construction of the second <br /> barn will include landscaping, handicapped restroom, parking <br /> and a gravelled road to the barn. <br /> Manure Management Plan <br /> I expect to have about 8 to 10 horses in the first phase of <br /> the project. The stalls will be cleaned daily. The manure and <br /> shavings will be put directly into a manure spreader . When <br /> the spreader is full or about every 3 days the manure will be <br /> spread thinly over the back of the property, about 12 acres, <br /> to dry. <br /> When the larger proposed 18 stall barn is finished. I expect <br /> to have about 30 horses. The stalls will be cleaned daily and <br /> the manure will be spread daily over the back 12 acres to <br /> dry. After the manure has dried the area will disced to <br /> incorporate the manure and keep the weed growth under <br /> control . <br /> Fly Control Plan <br /> The main fly control program will focus on the proper <br /> handling and disposal of the manure and shavings. surface <br /> sprays will also be used around the existing pipe stalls. <br /> The new construction will have a auturnatic spray system <br /> installed. <br /> Excess Water Management Plan <br /> Water from the roof of the large barn will be diverted into <br /> the existing watering system to the orc=hard. Water from the <br /> existing pipe stalls is not a problem. <br />
The URL can be used to link to this page
Your browser does not support the video tag.