Laserfiche WebLink
N otes <br />Estimates for capital costs for initial LO -CAT system purchase and installation are based on estimates obtained from <br />} SCS Engineers from previous estimates from Merichem <br />2 The design,- permitting, and startup casts for the catalyst systems were estimates made by SCS Engineers from recent experience <br />3 Applied at 8.75% rate for major equipment purchases <br />Fil <br />"A 10% contingency was applied and considered reasonable for the uncertainties with this project <br />5 SCS estimate assuming $0.1511b cleanout plus disposal costs due to water content <br />6 SCS estimate assumes 4 hours of operating labor per day per 5 day workweek . <br />7 SCS estimate 5% of capital costs <br />a SCS estimates 18.1 kW required at $0.11 kW -hr for a full year (8,760 hours), 50% contingency also included <br />