My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0008758
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAVERLY
>
6484
>
2600 - Land Use Program
>
PA-1100073
>
SU0008758
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:33:40 AM
Creation date
9/9/2019 11:03:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0008758
PE
2631
FACILITY_NAME
PA-1100073
STREET_NUMBER
6484
Direction
N
STREET_NAME
WAVERLY
STREET_TYPE
RD
City
LINDEN
APN
09344002
ENTERED_DATE
5/23/2011 12:00:00 AM
SITE_LOCATION
6484 N WAVERLY RD
RECEIVED_DATE
5/20/2011 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WAVERLY\6484\PA-1100073\SU0008758\APPL.PDF \MIGRATIONS\W\WAVERLY\6484\PA-1100073\SU0008758\CDD OK.PDF \MIGRATIONS\W\WAVERLY\6484\PA-1100073\SU0008758\EH COND.PDF \MIGRATIONS\W\WAVERLY\6484\PA-1100073\SU0008758\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N otes <br />Estimates for capital costs for initial LO -CAT system purchase and installation are based on estimates obtained from <br />} SCS Engineers from previous estimates from Merichem <br />2 The design,- permitting, and startup casts for the catalyst systems were estimates made by SCS Engineers from recent experience <br />3 Applied at 8.75% rate for major equipment purchases <br />Fil <br />"A 10% contingency was applied and considered reasonable for the uncertainties with this project <br />5 SCS estimate assuming $0.1511b cleanout plus disposal costs due to water content <br />6 SCS estimate assumes 4 hours of operating labor per day per 5 day workweek . <br />7 SCS estimate 5% of capital costs <br />a SCS estimates 18.1 kW required at $0.11 kW -hr for a full year (8,760 hours), 50% contingency also included <br />
The URL can be used to link to this page
Your browser does not support the video tag.