Laserfiche WebLink
• <br /> Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-07-130(SA) <br /> 5. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is$1,040.00 per 1000 gross square foot of building. <br /> The fee is based on the current schedule designated as retail. (Resolution R-06-38) <br /> 6. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. The fee currently is $651.00 per 1,000 gross square <br /> foot of building designated as Service Commercial. The fee shall be automatically increased on January 1 <br /> of each year through the year 2015 at the rate of 4.55 percent. (Development Title Section 9-818.4 and <br /> Resolutions R-91-327, R-94-185 and R-97-5) <br /> 7. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 8. Verification shall be obtained from the Solid Waste Division (468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:av <br /> P:\COMMENTS\SAM 200T A-0]00130 APPLICATION-AEVISION.wpd <br />