My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012395
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILLOW GLEN
>
13285
>
2600 - Land Use Program
>
PA-1800301
>
SU0012395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 3:13:46 PM
Creation date
9/9/2019 11:07:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012395
PE
2656
FACILITY_NAME
PA-1800301
STREET_NUMBER
13285
Direction
S
STREET_NAME
WILLOW GLEN
STREET_TYPE
RD
City
STOCKTON
Zip
95206-
APN
19104007
ENTERED_DATE
6/28/2019 12:00:00 AM
SITE_LOCATION
13285 S WILLOW GLEN RD
RECEIVED_DATE
4/13/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\W\WILLOW GLEN\13285\PA-1800301\SU0012395\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Community Development Department <br />PA -1800301 (AE) <br />6. An encroachment permit shall be required for work within road right-of-way. (Development Title Sections 9- <br />1145.4 and 9-1145.5) <br />The driveway approach on Crocker Road used for hauling shall be improved in accordance with the <br />requirements of San Joaquin County Improvement Standards Drawing No. 17 [including return radii to <br />accommodate truck -trailer movements for trucks exiting the site so as not to encroach on opposing lanes of <br />traffic. Truck turn templates shall be provided for right in and right out movements]. (Development Title <br />Section 9-1145.5) <br />8. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the time <br />of improvement plan application. The fee shall be based on the current schedule. The fee shall be automatically <br />adjusted July 1 of each year by the Engineering Construction Cost Index as published by the Engineering News <br />Record. (Resolutions R-90-304, R 9-1025, R-93-167, R-94-650, and R-96-592) <br />9. The Regional Transportation Impact Fee shall be required for this application. The fee is due and payable at the <br />time of improvement plan application. The fee shall be based on the current schedule at the time of payment. <br />(Resolution R-06-38) <br />10. A cash deposit or security, in the amount and form acceptable to the Department of Public Works and the <br />Division of Mine Reclamation, shall be filed with the Department to ensure reclamation for the site, compliance <br />with conditions of approval, and compliance with County and State mining regulations. (Development Title 9- <br />1410.3) <br />AT; CH <br />
The URL can be used to link to this page
Your browser does not support the video tag.