My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0012395
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILLOW GLEN
>
13285
>
2600 - Land Use Program
>
PA-1800301
>
SU0012395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2022 3:13:46 PM
Creation date
9/9/2019 11:07:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0012395
PE
2656
FACILITY_NAME
PA-1800301
STREET_NUMBER
13285
Direction
S
STREET_NAME
WILLOW GLEN
STREET_TYPE
RD
City
STOCKTON
Zip
95206-
APN
19104007
ENTERED_DATE
6/28/2019 12:00:00 AM
SITE_LOCATION
13285 S WILLOW GLEN RD
RECEIVED_DATE
4/13/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\tsok
Supplemental fields
FilePath
\MIGRATIONS\W\WILLOW GLEN\13285\PA-1800301\SU0012395\APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pacific Cas and <br />Electric Company <br />service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br />system must be reviewed and approved by PG&E Corrosion Engineering. <br />12. Pipeline Marker Signs: PG&E needs to maintain pipeline marker signs for gas <br />transmission pipelines in order to ensure public awareness of the presence of the pipelines. <br />With prior written approval from PG&E Pipeline Services, an existing PG&E pipeline marker sign <br />that is in direct conflict with proposed developments may be temporarily relocated to <br />accommodate construction work. The pipeline marker must be moved back once construction is <br />complete. <br />13. PG&E is also the provider of distribution facilities throughout many of the areas within <br />the state of California. Therefore, any plans that impact PG&E's facilities must be reviewed and <br />approved by PG&E to ensure that no impact occurs which may endanger the safe operation of <br />its facilities. <br />PG&E Gas and Electric Facilities Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.