Laserfiche WebLink
`�""`1 s 7 c o c, Inc. <br />SSS Eeat Web¢e Avenue a St¢etunrt CA 951A] • RO9) ]35-n6O0 a FAX CSO9) 2i.4Oi38 <br />Snn Jonquin County Multi-Syeciea Habitnt Conservation N Open Space Pian (SJMSGP) <br />SJMSGP RESPONSE TO LOCAL JURISDICTION (RTLJ) <br />ADVISORY AGHNCY NOTICH TO SJCOG, Inc. <br />To: Giuseppe Sanfilippo, San Joaquin County. Community Development Department <br />From: Laurel Boyd. SJCOG, Inc. <br />Data: May 22, 2019 <br />Local Jurisdiction Project Title: PA -1800301 (AE) <br />Assessor Parcel NumbeKa): 191 -040 -OT, -08 <br />Local Juriadlctlon Project Number: PA -1800301 (AE) <br />Total Acres to ba convertetl from Open Spaea Use: Unknown <br />Robitet Types to be Disturbed: Agricultural end Multi -Purpose Opan Space Habitat Land <br />Species Impact Findings: Fintlings [o ba tlatarminetl by SJMSGP biologist. <br />Daar Mr. Sanfilippo: <br />SJCOG, Inc. has reviewed the application refamal for PA -1800301 (AE). This project consists of an Agricultural <br />Excavation application [o remove 97.000 cubic yards of material over two (2) years from a 74.06 -acre parcel antl a 74.66 <br />acre parcel in the AG -180 (General Agricultural, 180 -etre minimum) zone. The project site is located on [he east sitle of <br />South Willow Glan Road, 2,455 feet north of Wast Undine Road, south of Stockton (APN/Atltlrass: 191-040-07. - <br />OS/13286 South Wlilow Glan Road, Stockton). <br />San Joaquin County Is a signatory to San Joaquin County Multi -Species Habi[a[ Conservation antl Opan Space Plan <br />(SJMSGP). Participation In [he SJMSGP satisfies requirements of both the state antl federal endangered species acts, <br />antl ensures that [ha impacts are mitigated below a level of signiflcanca in compliance with the California Environmental <br />Quality Act (CEOA). Tha LOCAL JURISDICTION retains responsibility for ensuring that the appropriate Incidental Take <br />Minimization Measure are properly implamenled antl moni[oretl and that appropriate fees era paid in compliance with the <br />SJMSGP. Although participation in the SJMSGP is voluntary, Local Judstllction/Lead Agencies should ba aware [hat If <br />project applicants choose against participating In the SJMSGP, they will be required to provide alternative mitigation in an <br />amount antl kind equal to That providetl in the SJ MSCP. <br />Th/s project /s subJecf to the SJMSGP and is located within the unmapped land use area. Par requirements of [ha <br />SJMSGP, unmappetl projects are subject to case-by-case review. This can baa 90 day process antl it is recommentlad <br />that the project applicant contact SJMSGP staff as early es possible. It Is also recommended [hat [he project applicant <br />obtain an informatbn package. http://wwwsjcoe.vrg <br />After this project is approved by the Habitat Technical Ativisory Committee and the SJCOG Inc. Board, the fallowing <br />process mus[ occur to partiGpate in [he SJMSGP: <br />Schedule a SJMSGP Biologist to pertorm a pre -construction survey prior to any grountl tl/sFur6anca <br />SJMSGP Incitlantal take Minimization Measures antl mitigation requirement <br />incidental Tekv Mlnimimtian Meeaurcs (n'MMg) will be issued [o the pNieet end mus[ ba signed by the pmjmt appliaent peioe [e any <br />Mcound tliamWenm but no Islet tlwn ais (6) months M1um receipt of tFta tTMMa. If ITMMx are not signeA within sia mon[M1a. the aPPhaenl <br />eapp lY fe a' S]MSCP Covaeaga. Vpon teteip[ oEaigned ITMMa frvm p,oject epplicanq gICOO. ins, s[n1Fwi11 sign the I'[MMs. Thle <br />l the effect a date ofthe 1TMMa. <br />Vndm'n dm ahallgmund d"ulu[be,m i[hou mplie ands ixfac of [ha lTMMs. <br />Vpon issuance of Nlly exauted ffMMs aM pcio to any g[outW disNdaence, the p jest apPlieant murt: <br />a. Poet a band Fac payment of [he eppLLceble SIMSCP fee cov<dng the entiaety oPthe p jecl acmage being covemA Qhs bond <br />ahoub be valid !or no bnga Men a fi month periadj; a <br />b. Pey the epPtopria[e SJMSGP !tt 8ar the anlimty oEN¢ proJ'ec[ acreage being covemd: ar <br />nrdicnta land in -lieu offeea, either ea consatveNon esaemems or Re title: ar <br />d Purehvae apPmved mitigation baNc cavdita. <br />Within 6 months IYom the etrtttive dote of Me tTMMs or ieaonnce of a building pecrt,it. whiehevec occurs ficaL Ih< pcoJ'ect applicant muSL <br />e. Pay the npp[npriete SJMSGP tos the cntiteay ofthe project acruge being coveted: oc <br />