Laserfiche WebLink
Pacific Gas and <br />E/ect�ic Company <br />service lines, ground rods, anodes, wires, etc. that might affect the pipeline cathodic protection <br />system must be reviewed and approved by PGBE Corrosion Engineering. <br />12. Pipeline Marker Signs: PGBE Heads to maintain pipeline marker signs for gas <br />transmission plpelin¢s in order to ensure public awareness of the presence of the pipelines. <br />With prior written approval from PGBE Pipeline Services. an existing PGBE pipeline marker sign <br />that is in direct conflict with proposed developments may ba temporarily relocated to <br />accommodate construction work. The pipeline marker must be moved back once construction is <br />complete. <br />13. PGBE Is also the provider of distribution facilities throughout many of the areas within <br />the state of California. Therefore, any plans that impact PGBE's facilities must ba ravi¢w¢d and <br />approved by PGBE to ensure that no impact occurs which may endanger the safe operation of <br />its facilities. <br />PGSaH Gas and Clectric Facilities Page 4 <br />