Assmann Corporation of America <br /> TANK INSTALLATION AND USE GUIDELINES FOR BULK STORAGE TANKS <br /> General Information <br /> for acceptance regardless of whether it is Assmann <br /> Assmann polyethylene storage tanks are manufactured to give Corporation's truck or a contract carrier.Look inside the tank <br /> you the toughest,most reliable and economical vessels for fittings or accessories that may have been shipped loose. <br /> offered for storing industrial strength chemicals such as <br /> sulfuric acid,sodium hydroxide,sodium hypochlorite and Failure to document damage or incompleteness of the <br /> many other corrosives. Our unique process utilizing uniform vessel becomes the responsibility of the purchaser. <br /> walls and air-cooling gives us an advantage over any other <br /> polyethylene tank manufactured today. However,these Contact Assmann Corporation for information on which party <br /> vessels are not immune to damage. Precautions must be taken is responsible for filing the claim for damaged equipment. <br /> while off loading,handling,installing,and using to protect <br /> your investment. Off Loading Polyethylene Tanks <br /> These handling and installation instructions are only Assmann rotationally molded tanks are by far the toughest <br /> recommendations and do not relieve the purchaser of the polyethylene tanks offered to the industrial market. However, <br /> responsibility to inspect the tank upon delivery and to the fittings and tanks are susceptible to damage if improperly <br /> properly handle and install the vessel. Any damage that is the handled. DO NOT ALLOW THE TANK TO ROLL OVER <br /> result of improper handling or installation will be the sole INSTALLED FITTINGS. Whenever possible,use a crane <br /> responsibility of the purchaser. Failure to comply with or other suitable lifting devices to remove the tanks from <br /> handling and installation instructions will void all warranties, the truck. Because the stability of the tanks can be affected <br /> expressed or implied. Misuse or undocumented applications by wind,the party responsible for off loading the tank shall <br /> are the burden of the purchaser. secure the tank to keep total control of the vessel while <br /> handling. See figure#I and#2 for suggestions on how to <br /> Preparing The Tank Site handle the tanks when off loaded. <br /> Complete bottom support of all polyethylene tanks must Figure#1 <br /> always be maintained. <br /> Using an overhead <br /> Assmann Corporation recommends that all tanks be placed on lifting device,make a <br /> a concrete foundation capable of supporting the weight of the choker collar and grasp <br /> tank with accessories and its intended service(chemical). top one-third of the tank <br /> Vertical tanks over 6500 gallon capacity require a reinforced while gently raising. <br /> concrete foundation. Tanks from 6500 gallon and below that Lower onto permanent <br /> cannot be placed on a concrete foundation must be placed on site.Use caution to <br /> an area that is compacted,level,smooth,and free of any prevent the tank from <br /> foreign objects that may damage the vessel. slipping on the <br /> foundation. <br /> Assmann Corporation also recommends that at least six(6) <br /> layers of roof felt be placed between the tank and its intended <br /> foundation. This will allow the tank to move without Figure#2 <br /> restriction. <br /> Assmann Corporation is not responsible for damage due <br /> to improper tank base preparation. Insert wooden n b x 4-in. <br /> beam <br /> Receiving Your Polyethylene Tanks through the tap of the <br /> manway,lift and <br /> deliver to permanent <br /> At the time of delivery the purchaser shall be responsible for site. Units over <br /> inspecting the tank and accessories for shipping damage 400 Ib. may require <br /> before off loading. If damage has occurred,it must be noted steel I-beam in place <br /> on the driver's shipping papers/bill of lading prior to signing of the wooden beam. <br /> 1 <br />