Laserfiche WebLink
an0.Mlry, <br /> F r, <br /> lP.O.BOX 1810-1910 E.HAZELTON AVENUE <br /> ! _ THODIRECTORMAS M. GAU ``p(A.kf"NL STOCKTON,CALIFORNIA 95201 <br /> J (209)469-3000 FAX(209)468-2999 <br /> WPN sjgm.Or9(PBbworks <br /> FRITZ BUCHMAN <br /> DEPUTY DIRECTOR :F� , <br /> MICHAEL SELLING workwg for YOU <br /> DEPUTY DIRECTOR <br /> ROGER JANES <br /> BUSINESS ADMINISTRATOR <br /> September 5,2012 <br /> MEMORANDUM <br /> TO: John L. Funderburg, Principal Planner <br /> Community Development Department <br /> CONTACT PERSON: Rick Griffin <br /> FROM: Alex Chetley, Engineering Services Manager <br /> Development Services Division <br /> SUBJECT: PA-06-033; A Revisions of Approved Actions application to revise Condition of Approval Lb for a <br /> small winery to increase the number of marketing events from the previously approved four per year <br /> to sixteen per year and to increase the number of people per marketing event from the previously <br /> approved 40 people to 120 people per marketing event; located on the south side of Woodbridge <br /> Road, approximately 1,700 feet west of Tretheway Road, south of Woodbridge Road,Lodi, <br /> (Supervisorial District 4) <br /> PROPERTY OWNER: Tom Hoffman APPLICANT: Heritage Oak Winery <br /> ADDRESS: 10112 E. Woodbridge Road APN: 017-230-01 <br /> INFORMATION: <br /> A portion of the site is currently located within a Federal Flood Insurance Administration Designated Flood Hazard <br /> Area. <br /> Woodbridge Road has an existing right-of-way width that varies and a planned right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. The Traffic Ifnpact Mitigation Fee shall be required for the incremental traffic from this revision. The fee is <br /> due and payable at the time of building permit application. The fee shall be automatically adjusted July I of <br /> each year by the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> 2. The Regional Transportation Impact Fee shall be required for the incremental traffic from this revision. The <br /> fee is due and payable at the time of building permit application. The fee will be based on the current schedule <br /> at the time of payment, (Resolution R-06-38) <br />