Laserfiche WebLink
`. `. <br /> Mr Gri/fin February 16, 2006 <br /> PA-0600033(SA) Page 3 <br /> - Require that all diesel engines be shut off when not in use on the premises to reduce emissions from <br /> idling. <br /> - Curtail construction during periods of high ambient pollutant concentrations; this may include ceasing <br /> of construction activity during the peak-hour of vehicular traffic on adjacent roadways, and"Spare the <br /> Air Days" declared by the District. <br /> - Implement activity management(e.g. rescheduling activities to reduce short-term impacts) <br /> - During the smog season (May through October), lengthen the construction period to minimize the <br /> number of vehicles and equipment operating at the same time. <br /> - Off road trucks should be equipped with on-road engines when possible. <br /> - Minimize obstruction of traffic on adjacent roadways. <br /> District staff is available to meet with you and/or the applicant to further discuss the regulatory requirements <br /> that are associated with this project. If you have any questions or require further information, please call me <br /> at (559) 230-5818 or Mr. Dave Mitchell, Planning Manager, at (559) 230-5807 and provide the reference <br /> number at the top of this letter. <br /> Sincerely, <br /> VV�J <br /> qesA�ica/R.Willis <br /> Air Quality Specialist <br /> Central Region <br /> c:file <br />