Laserfiche WebLink
Chandler Martin -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-06-444(SA) <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and payable at the <br /> time of building permit application. (The fee currently is$4,513.00 per 1,000 gross square foot of building <br /> designated as Retail Services in the Lodi area. The fee shall be automatically adjusted July I of each year <br /> by the Engineering Construction Cost Index as published by the Engineering News Record.) (Resolutions <br /> 00-433) <br /> 4. The Regional Traffic Impact Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee currently is$1,040.00 per 1000 gross square foot of building <br /> designated as Retail Services. The fee is based on the current schedule. (Resolution R-06-38) <br /> 5. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> 7. The project shall be served by a public water system conforming to the requirements of the San Joaquin <br /> County Public Health Services Environmental Services Division and the Department of Public Works. The <br /> Services shall be provided by Mokelumne Acres Maintenance District. <br /> 8. The applicant/developer is subject to Area of Benefit No. 7,Woodbridge Greens, and shall pay appropriate <br /> fees prior to issuance of any building permit. (Development Title Section 9-1100.3). <br /> 9. The applicant/developer is subject to area of Benefit No. 10,Bank of Lodi, and shall pay appropriate fees <br /> prior to issuance of any building permit. (Development Title Section 9-1100.3) <br /> 10. Annexation of the development into Mokelumne Acres Maintenance District for Storm Drainage and <br /> Water shall be required,prior to issuance of any building permit. A fee per acre shall be paid to process <br /> the annexation. The fee shall be based on current schedule. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1)acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:DG:av <br /> PACOAAtEMfS\SAX"30061PA-0b0 .wpd <br />