Laserfiche WebLink
Conditions <br /> Use Permit Application No. PA-1800279 was approved by the Planning Commission on .The effective <br /> date of approval is.This approval will expire on,which is 18 months from the effective date of approval, <br /> unless(1)all Conditions of Approval have been complied with, (2)all necessary building permits have <br /> been issued and remain in force, and (3) all necessary permits from other agencies have been issued <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1) COMMUNITY DEVELOPMENT DEPARTMENT(Staff Contact: Frank Girardi, [209]468-8469) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT'. The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST"for details). A fee is required for the Site Plan review. (Development Title Section 9- <br /> 884) <br /> b. APPROVED USE: This approval is to establish a large winery in five (5) phases over ten (10)years <br /> as shown on the site plan dated November 2,2018. (Use Type:Wineries and Wine Cellars-Winery, <br /> Large) <br /> • Phase 1 (with building permits to be issued within eighteen [18] months from the effective date <br /> of approval) the construction of a 10,000 square foot Storage and Bottling building <br /> • Phase 2 (with building permits to be issued within seven [7] years from the effective date of <br /> approval)includes the construction of a 35,000 square foot building for an Event center,Tasting <br /> room, and Executive offices. <br /> • Phase 3 (with building permits to be issued within eight [8] years from the effective date of <br /> approval) includes the construction of a 10,000 square foot expansion to the Phase One <br /> Storage and Bottling building. <br /> • Phase 4 (with building permits to be issued within nine [9] years from the effective date of <br /> approval) includes the construction of a 10,000 square foot expansion to the Phase Three <br /> Storage and Bottling building expansion. <br /> • Phase 5 (with building permits to be issued within ten [10] years from the effective date of <br /> approval) includes the construction of a 10,000 square foot expansion to the Phase Four <br /> Storage and Bottling building expansion. <br /> c. PRODUCTION CAPACITY: A large winery shall have a minimum production capacity of 100,000 <br /> gallons of wine per year. (Development Title Section 9-1075.3[a]) <br /> d. SETBACKS: The following requirements apply and shall be shown on the Site Plan: <br /> (1) New construction or the use of existing buildings, permanent parking areas and outdoor <br /> eating/entertaining areas shall be set back a minimum of 200 feet from Woodbridge Road <br /> (Development Title Section 9-1075.3[c][1]) <br /> e. MARKETING EVENTS: Marketing Events are subject to the following regulations: <br /> San Joaquin County PA-1800279\Stokes and Lombardi Farms <br /> Community Development Page 6 <br />