My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009026
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
5950
>
2600 - Land Use Program
>
UP-970016
>
SU0009026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 9:47:07 AM
Creation date
9/9/2019 11:12:20 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009026
PE
2656
FACILITY_NAME
UP-970016
STREET_NUMBER
5950
Direction
E
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
ACAMPO
APN
01709058
ENTERED_DATE
1/10/2012 12:00:00 AM
SITE_LOCATION
5950 E WOODBRIDGE RD
RECEIVED_DATE
1/6/2012 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\W\WOODBRIDGE\5950\UP-97-16\SU0009026\REV SITE PLN.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY PLANNING COMMISSION AGENDA <br /> Public Heafth/Pianning Auditorium <br /> San Joaquin County Department of Public Health Services <br /> 1601 East Hazelton Avenue, Stockton, California <br /> THURSDAY, May 17, 2012 Environmental Health Dept <br /> s:3o P.M. Attn: Rodney Estrada <br /> • Flag Salute 600 E. Main Street <br /> Roll Call il'1r 2 /!ri%�Pgek0, G Stockton, CA 95202 <br /> • Minutes From Meetings of May 3, 2012 <br /> • Action on Requests for Continuances or Withdrawals (if needed) <br /> • Explanation of Hearing Procedures <br /> • Action Items: <br /> 1. REVISIONS OF APPROVED ACTIONS FOR USE PERMIT APPLICATION NO. <br /> UP-97-0016 OF RME, INC., (C/O JAMES CRANDELL) to revise Conditions of <br /> Approval 1.b. &c.to amend the phasing for the expansion of an existing winery. The <br /> revision would allow for full buildout from the previously approved six phases over ten <br /> years to full buildout in five phases over an additional twelve years. Phase One <br /> includes the construction of a 1,000 square foot awning, a 2,500 square foot arbor <br /> and an upgrade to the winery's management operations of treated processed waste <br /> water for agricultural crop irrigation. Phase Two includes the construction of a <br /> 272,941 square foot case warehouse building and relocation of a 195 square foot <br /> pump shed. Phase Three includes the construction of a 277,900 square foot barrel <br /> warehouse facility. Phase Four includes the addition of 87 parking spaces and a <br /> 4,000 square foot training and hospitality facility. Phase Five includes the <br /> construction of a 13,000 square foot public relations facility building. No marketing <br /> events are proposed. The project site is located at the terminus of Kennefick Road, <br /> on the south side of Woodbridge Road,Acampo, (Supervisorial District 4). <br /> Environmental Determination: An Initial Study has been prepared indicating the <br /> project will not have a significant impact on the environment, and a Negative <br /> �II Declaration has been prepared for the project. <br /> I �J' 2. REVISIONS OF APPROVED ACTIONS FOR SITE APPROVAL APPLICATION <br /> NO. PA-0600203 OF OUR LADY OF FATIMA(C/O RICHARD EDWARDS)to <br /> amend eight previously approved special outdoor events to allow for the following <br /> lYmoic Un dates and times: (1) May 19-21, 2012; 11:00 a.m.to 9:00 p.m. (Rodeo); (2) June 9- <br /> 11, 2012; 11:00 a.m.to 9:00 p.m. (Rodeo); (3)July 7-9,2012 11:00 a.m.to 9:00 <br /> p.m. (Rodeo), (4) August 11-13, 2012; 11:00 a.m.to 9:00 p.m. (Rodeo); (5) <br /> September 8-10, 2012; 11:00 a.m.to 9:00 p.m. (Rodeo); (6) September 29-30 and <br /> October 1, 2012, 11:00 a.m.to 9:00 p.m. (Rodeo), (7)Third Friday and Saturday of <br /> October from 11:00 a.m.to 11:00 p.m. (Bloodless Bullfighting); (8) Third Sunday <br /> and Monday of October from 11:00 a.m.to 11:00 p.m. (Bloodless Bullfighting). The <br /> project site is located on the east side of North Sacramento Blvd., 538 feet north of <br /> West Oak Street, Thornton, (Supervisorial District 4). <br /> PC AGENDA 1 - PC: 5-17-12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.