Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan—Page 2 of 4 Rev.06/27/11 <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> SPILL PREVENTION,CONTAINMENT,AND CLEANUP PROCEDURES: (Check all boxes that apply to indicate your procedures for containing spills,releases, <br /> fires or explosions;and.preventing and mitigating associated harm to persons,property,and the environment. <br /> DI <br /> ❑x I. MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC.; <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls), <br /> ❑x 3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e.g.,Pads,pigs,pillows); <br /> ❑x 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑5. BUILT-IN BERM IN WORK/STORAGE AREA; <br /> ❑x 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑x 7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS(e.g.Flammable liquids,Propane); <br /> ❑x 8. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ® 10.SHUT-OFF WATER,GAS,ELECTRICAL UTILITIES AS APPROPRIATE; <br /> ❑x 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE/MEDICAL AID; <br /> 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AREAS; <br /> ❑x 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION CALL; <br /> ❑x 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE RESPONSE TEAM; <br /> ❑x 15.REMOVE OR ISOLATE CONTAINERS/AREA AS APPROPRIATE; <br /> ❑ 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> 17,USE ABSORBENT MATERIAL FOR SPILLS WITH SUBSEQUENT PROPER LABELING,STORAGE,AND HAZARDOUS WASTE DISPOSAL AS <br /> APPROPRIATE; <br /> ❑ 18.SUCTION USING SHOP VACUUM WITH SUBSEQUENT PROPER LABELING,STORAGE,AND HAZARDOUS WASTE DISPOSAL AS <br /> APPROPRIATE; <br /> ❑ 19.WASH/DECONTAMINATE EQUIPMENT W/CONTAINMENT and DISPOSAL OF EFFLUENT/RINSATE AS HAZARDOUS WASTE; <br /> ❑x 20.PROVIDE SAFE TEMPORARY STORAGE OF EMERGENCY-GENERATED WASTES; <br /> ❑2L OTHER(Specify): D2 <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(CHECK ALL THAT APPLY): EI. <br /> ❑ I. BELLS; <br /> ❑x 2. HORNS/SIRENS; <br /> ❑x 3. VERBAL(I.E.,SHOUTING); <br /> ❑4. OTHER(Specify): E2. <br /> THE FOLLOWING LOCATION(S)IS/ARE EVACUEE EMERGENCY ASSEMBLY AREA(S)(i.e.,Front parking lot,specific street comer,etc.) E3. <br /> Concrete Wash Rack on South West Side of Hangar <br /> Note:The Emergency Coordinator must account for all on site employees and/or site visitors after evacuation. <br /> x EVACUATION ROUTE MAP(S)POSTED AS REQUIRED E4. <br /> Note: The map(s) must show primary and alternate evacuation routes,emergency exits,and primary and alternate staging areas, and must be prominently posted <br /> throughout the facility in locations where it will be visible to employees and visitors. <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> Explanation of Requirement:Advance arrangements with local fire and police departments, hospitals, and/or emergency services contractors should be made as <br /> appropriate for your facility.You may determine that such arrangements are not necessary. <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following) FI <br /> ❑x I. HAVE BEEN DETERMINED NOT NECESSARY;or <br /> ❑2. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): F2 <br />